05/19/2021 - MinutesSEWER ADVISORY COMMITTEE MEETING MINUTES May 19, 2021 6:30 PM The meeting was called to order at 6:37 PM by Chair Lucarelli. Sewer Advisory Committee (SAC) members Clauson and Lucarelli of the Port Orchard City Council; Commissioners Hart, Lundberg and Way of the West Sound Utility District; City Utility Manager Brown; WSUD General Manager Screws; and SKWRF Plant Manager Grabill met via Zoom Meetings. APPROVAL OF MINUTES Commissioner Hart made a motion, seconded by Councilmember Clauson, to approve the minutes of September 16, 2020. The motion passed unanimously. PROJECTS AND UPDATES Capital and Maintenance Projects CAS Aeration Upgrades The new Aerostrips are scheduled to be installed on June 7th . Additionally, 100 channel air diffusers and 5 channel air valves were replaced last year and there are 100 more on order to replace during the Aerostrip installations. This will address any more air loss in the CAS process saving energy as well as having a more efficient operation. Scum Pit Pumn Installation This was completed last year and on line. This project was an original plant design that needed to be addressed. Prior to completion, the solids or grease skimmings from the secondary clarifiers would just recirculate through the plant endlessly. The completion of this project cleaned up the Conventional Process making it easier to maintain permit limits while reducing operational labor costs. Effluent Sluice Gates. Both North and South contact channel sluice gates have been installed and are online. South was completed last year, North completed this year. Sharples We were initially set for panel replacement on the Sharples. Looking at the 30 year age of the equipment and the $30,000 it costs per year to operate, Plant Manager Grabill decided to look at other options that could save money while not putting such a big band aid on a piece of equipment at the end of its useful life. Mr. Grabill is exploring using an ESCO (Energy Services Company) through DES and requested that the SAC authorize him to execute an Interagency Agreement with Washington State Department of Enterprise Services. The SAC unanimously approved his request. Asphalt Overiay Overlay, seal coating and striping have been in progress within the SKWRF grounds and are set for completion 2611 of May. Fencing: The SKWRF 2021 budget authorized continued fencing repairs and replacements. This year a vinyl coating on the fencing was used to prevent previous corrosion issues and hopefully get a few more years out of it. The Fencing has been completed aside from the gate which is being made currently and will be installed to complete the fence project for this year. OUTSTANDING TREATMENT PLAN AWARD The SKWRF was a recipient of the "Outstanding Performance Wastewater Treatment Plant Award" for 2019. PUGET SOUND NUTRIENT GENERAL PERMIT PRELIMINARY DRAFT If we actually go by the permit language for the calculation once the permit was active: Average loading is 16.425 lbs. per ERLI. With the averages from 2017-2019 at 194,235 lbs. loading, this calculation would leave us with around 1,264 ERLI's before reaching the initial Action Level ("ALO") of 215,000. (ALO is optimization actions that focus more on operational strategies with very little, if any, equipment procurement.) Formal Draft of the Nutrient General Permit is due out by close of business on June 16, 2021, with the public comment period ending on August 21. MARINA PUMP STATION The 80% plans are nearing completion. Several coordination issues with the SK Events Center plans and the Imagine Port Orchard plans were recently resolved. MEETINGS The next meeting will be held at 6:30 PM on July 21, 2021 at the SKWRF and available via zoom. There being no further business, the meeting was adjourned at 7:36 PM. Mund Utilit Dist ict ry I b g Cit r e and J n Clauson -u& ' Cind carelli 4- � � �- JTY'sktpe