Loading...
2080 - Resolution - Signing the Discharge Monitoring ReportRESOLUTION NO. 2080 A RESOLUTION OF THE CITY OF PORT ORCHARD AUTHORIZING THE ASSISTANT CITY ENGINEER TO SIGN THE DISCHARGE MONITORING REPORT. WHEREAS, the City of Port Orchard and Karcher Creek Sewer District jointly own and operate the Wastewater Treatment Facility; and WHEREAS, the Department of Ecology requires the Wastewater Treatment Facility to submit a Discharge Monitor Report monthly, which lists the flow volumes, characteristics, and volumes, and is signed by the National Pollutant Discharge Elimination System (NPDES) permit holder; and WHEREAS, the City of Port Orchard is the lead agency (permit holder) listed on the NPDES permit for the Wastewater Treatment Facility; now therefore, THE CITY COUNCIL OF THE CITY OF PORT ORCHARD DOES HEREBY RESOLVE THAT: The Assistant City Engineer is designated to be the City Official who shall sign the Discharge Monitoring Report, until such time as a Public Works Director/City Engineer is hired, at which time the Public Works Director/City Engineer shall be the designee for this responsiblity. PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor, and attested by the Clerk in authentication of such passage this 26th day of July 2004. ATTEST: KIM E. ABEL, MAYOR