1813 - Resolution - Conditional Use Permit for Cliff ThompsonCity of Port Orchard 216 Prospect Street Port Orchard, WA 98366 RESOLUTION NO. 1813 A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON PROVIDING A CONDITIONAL USE PERMIT FOR CLIFF THOMPSON FOR A NEW BULKHEAD AND APPROPRIATE BACK FILL Tax Account No. 342401-2-007-2006 Legal Description: Section 34, Township 24, Range 1 East, West 100 feet of Lot 2 excluding the road and tideland frontage. WHEREAS, the City annexed Ross Point in December 1997; and WHEREAS, WAC 173-26-160 requires the City to use the Kitsap County Shoreline Management Master Program until such time as the City's Shoreline Master Program is amended to recognize the Ross Point area; and WHEREAS, the applicant submitted a substantial development permit and conditional use permit application on February 28, 1998 for shorelines review to construct a 140- foot long bulkhead and back fill the area behind it with approximately 150 cubic yards of rock fill; and WHEREAS, the project referred to as the Cliff Thompson bulkhead and back fill has received a Mitigated Determination of Non -Significance by Kitsap County in 1996 which remains valid; and WHEREAS, a Hydraulic Project Approval was granted for this project from the Department of Fish and Wildlife in 1996 which remains valid; and WHEREAS, a public hearing was held on June 8, 1998 by the City Council to hear facts and testimony concerning granting a conditional use permit with regard to the Shoreline Management Program; and WHEREAS, the City Council has determined that the granting of a conditional use permit is consistent with the intent of the Shoreline Management Program; now, therefore, Resolution No. 1813 Page 2of2 THE CITY COUNCIL OF THE CITY OF PORT ORCHARD DOES HEREBY RESOLVE THE FOLLOWING: The City of Port Orchard recommends approval to the Department of Ecology for the granting of a conditional use permit to allow the construction of a 140-foot long timber bulkhead with 150 cubic yards of rock back fill for Cliff Thompson with the following conditions: 1. Applicant agrees to remove the log floats, piling, miscellaneous planks and the large steel mooring buoy from the beach. 2. Applicant agrees to leave all bank vegetation possible, except that which is necessary to remove for construction and worker safety purposes. 3. Applicant agrees to shorten the overall length of the bulkhead to approximately 140 feet (versus the original 175 feet) by eliminating approximately 35 feet at the southwest end of the bulkhead; the southwest end of the bulkhead shall end with a wing into the bank at an approximate 30-degree angle. 4. Applicant agrees to spread washed pea gravel at the foot of the new bulkhead at the rate of 1 cubic yard of material for each fi lineal feet of bulkhead. 5. Prior to commencement of work, a building permit shall have been issued from the City of Port Orchard. fi. Approval of this application does not include other alterations to the site. These must be considered separately. PASSED by the City Council of the City of Port Orchard, APPROVED by the Mayor and attested by the Clerk in authentication of such pa ge this 8th day of June, 1998. i LESLIE J. WEATHERILL, MAYOR Michelle Meriino, Deputy Clerk