Loading...
1702 - Resolution - Six-Year Transportation Improvement ProgramFOLLOWS: RESOLUTION NO. 1702;/ A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON ADOPTING THE SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM FOR THE YEAR 1996 - 2001. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, AS THAT: The six -year construction portion of the Six -Year Transportation Improvement Program for the years 1996 - 2001, a copy of which is attached hereto and marked Exhibit "A" and is an integral portion of the Six -Year Comprehensive Street program for the City of Port Orchard is hereby adopted. PASSED by the City Council of the City of Port Orchard, APPROVED by the Mayor and attested by the Clerk in authentication of such passage this 24th day of July, 1995. LESLIE J. WEATHERILL, MAYOR ATTEST: fib Patricia Parks, City Clerk ANOW VVashington State ®® Department of Transportation Agency City of Port Orchard County No. xitsap _ 18 _. City No. 1000 MPO PROJECT IDENTIFICATION < B-Iz. 0 0 - � s0 A. FEDERALAID NO, M rn F cn 0-1 0 B. BRIDGE NO. C. PROJECT TITLE � LU �- ¢ F-- 0 z - w 0 z U ccz D. STREETICOUNTY ROAD NAME OR NUMBER O(L CC >- O i-- w -O 4- :<_ E. TERMINAL BEGINNING AND END F. DESCRIBE WORK TO BE DONE 3 q : :5 ;:8... Sidney Avenue 17 Lippert St to SR16 05 P P Overlay Roadway, provide .5 S shoulders for non -motorists T G W Residential Paving Program C Overlay Roadways, as P detemi ned by funding 05 P S Capability T G W I~lelcher St Widening C . 17 l.7. Sherman Ave to Pottery Ave Reconstruction of Road 03 P .3 S T G W Pottery Avenue Widening C 1i Helcher Street to Tremont St 05 P .4 P Overlay roadway, provide S shoulders T G W DOT ram., i<aaeg - - Six Year Transportation Improvement Program Resolution No. 1-702 19 96 to 19 2001 Attachment "A' Hearing Date 24 Ju1y_ 1995 Adoption Date 24 July, 1995_ Rpcnh Minn Nn PROJECT COSTS IN THOUSANDS OF DOLLARS 7lc:rMONTH/ PHASE PE R/W CONST TOTAL PE R1W CONST TOTAL PE R/W CONST TOTAL PE R1W CONST TOTAL PE RM CONST TOTAL YEAR PHASE STARTS FUND SOURCE INFORMATION EXPENDITURE SCHEDULE (Local Agency) FEDERALLY PROJECTS FUNDED ONLY FEDERAL FUNDING RAP CAPP TIA DATA OTHER F STATE FUNDS LOCAL FUNDS :' 4< 1$ TOTAL 500 90 FEDERAL FUND CODE FEDERAL COST BY PHASE ENVIR. TYPE 20 EIS CE X EA NA EIS C E X EA NA EIS CE _-X— . EA NA EIS CE X EA NA EIS CE EA NA RIW REQ A RYIN DATE MONTH/YR 21 YIN DATE Y ! N DATE Y 1 N DATE YIN DATE Y ( N DATE 1st 6 25 2nd S 7 25 :3rd S 25 hr 19 90 25 500 90 72 90 100 100 300 500 16 72 90 rY 1 C� • C.RJlB. (CourK'ws Dr_ti) . 1 W.P. AMNW6 Washington State Department of Transportation Agency City of Port Orchard County No. Kitsap 18 City No. 1000 MPO 9 _j PROJECT IDENTIFICATION z 0 U) — I- CC L4. A. FEDERALAID NO. <U) 0: (n om B. BRIDGE NO. — :3. C. PROJECT TITLE z cc z D. STREET/COUNTY ROAD NAME OR NUMBER E. TERMINAL BEGINNING AND END F. DESCRIBE WORK TO BE DONE Port 0 rchard Boulevard SR166 to Tremont Street 14 Overlay Roadway, provide ped & bike paths Bay street Pedestrian Path 1800 Block Bay St 14 Concrete bulkhead and Walkway Annapolis Paving Program 19 Overlay existing streets improve storm drainage Bethel Wye Improvements 14 Traffic Signal and Realignment Pottery Avenue Overlay 14 eiLippert Street to Tremont St Overlay Roadway, provide shoulders for non -motorists DOT Fom 1404X9 sec 4194 Six Year Transportation Improvement Program Resolution No. 1702 19 96 to 19 2001 Attacbm,ent "A" Hearing Date 24 July 1995 Adoption Date 24 anly las) - Resolution N6. PROJECT COSTS IN THOUSANDS OF DOLLARS z FUND SOURCE INFORMATION FEDERAL FUNDING EXPENDITURE SCHEDULE FEDERALLY FUNDED LU > < z W p PROJECT MONTH/ RAP CAPP {Local Agemy) PROJECTS ONLY RAV REO AV RE" 00- d: >- I'- U) 0 �- w 0 PHASE YEAR FEDERAL FUND FEDERAL COST TIA CL ZE _j D 0 PHASE CODE BY DATA STATE LOCAL ENVIR. YIN IN DATE DATE 4th STARTS PHASE OTHER FUNDS FUNDS TOTAL I St 2nd 3rd thru TYPE MO NTHNR MONTH[YR Or 7 12; 3 14 1.5 16" 17 18 6th 19 20 21 CG PE 2/96 19 4 05 1 1 PS RM STP EIS Cr YIN 5Z96 46 F TW CONST 240 300 300 EA DATE 50 TOTAL 259 NA ---------- CG PE 32 F 00 PS RIW 2S YIN Tip CE X CONST 1/96 STP 40 10 50 50 EA DATE TOTAL 40 10 NA PE CG EIS YIN 05 F .3 PS RM CE X rf W CONST 1/96 25 25 25 EA DATE TOTAL — 25 NA 06 S 00 CG PE 45 5 EIS YIN pS M CE X TW CONST 115 15 200 200 EA DATE TOTAL 180 20 NA CG PE 18 PS RAq EIS YIN 05 P .5 TW CIE X CONST 72 90 EA DATE TOTAL 90 NA 0;strlb k,n: 2 Co0s% - 06bid lc.c-_'Y-C.RAB'(Courtieony). Local Pfoqarm Ei�rror. Copy I Cc LA.P. S . y Trznsportd�on 1rrprov6nVq-g Boa:d