Loading...
1641 - Resolution - Six-Year Transportation Improvement ProgramRESOLUTION NO. 1641 ✓ A RESOLUTION OF THE CITY OF PORT ORCHARD, WASHINGTON ADOPTING THE SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM FOR THE YEAR 1994 - 1999. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, AS FOLLOWS: THAT: The six -year construction portion of the Six -Year Transportation Improvement Program for the years 1994 - 1999, a copy of which is attached hereto and marked Exhibit "A" and is an integral portion of the Six -Year Comprehensive Street program for the City of Port Orchard is hereby adopted. PASSED by the City Council of the City of Port Orchard, APPROVED by the Mayor and attested by the Clerk in authentication of such passage this 12th day of July, 1993. ESLI J. WEATHERILL, MAYOR ATTEST: / / .) 11Z Patricia Hower, City Clerk Washington State Resolution No. 1641 SV Year Transportation Irt Department of Transportation Exhibit ""A"" 9 -r4 Agency Port Orchard County No. City No. _ i nn,0. MPO aan ir-rT inr-tiTiG1reTinti PROJECT COSTS IN THOUSANDS OF DOLLARS Hearing Date 12 Ju Adoption Date Resolution No. 1 —1 -.., . �., ..,,�.......,.....,.. ►- z Cr A. PROJECT TITLE 'u � J � } N o N m B. STREET/COUNTY ROAD NAIAE OR NUMBER -- w a C. TERMINAL BEGINNING AND END > _, J D. DESCRIBE WORK 70 $E DONE 0 0_ 0 z o PROJECT MONTH/ z � z a } �- "' — 0 PHASE YEAR a. a J o v PHASE U. STARTS — FUND SOURCE INFORMATION - EXPENDITURE SCHEDULE (Local Agency) FEDERAL FUNDING LOCAL RAP CAPP TIA UATA OTHER TOTAL FEDERAL COST BY PHASE FEDERAL FUND CODE 1st 2nd 4th 3rd THRU 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 RESIDENTIAL PAVING PROGRAM PE Overlay existing residential streets, as 04 6. determined by funds available and road RIw conditions. CONST TOTAL 150 150 50 50 50 PE RM CONST TOTAL PE R/W CONST TOTAL PE RIW CONST TOTAL PE RIW CONST TOTAL DOT Form 140-049 Disuitmion: z Capes - o n+rid �«� Progarrn Engriser. "Cavr Transportation Irtprcveme� board � Supersedes Previous Editions s 1 Copy • C.RJI.B. (Cowl ea Oq . 1 . Copy 11.P.0. P Washington State t o /0 �oartrnent of TransF . cation r9 q, �rt Orchard ` 18 19gU, 1000 Resolution tdo. 1641 8xh1b�.t "All PROJECT IDENTIFICATION a- cc A. PROJECT TITLE z �~ m B. STREET/COUNTY ROAD NA64E OR NUMBER C. TERMINAL BEGINNING AND END to w a 13 r w D. DESCRIBE WORK TO BE DONE o o- O z J Q PROJECT rr z 0. u' F- 0 PHASE C 1 2 3 4 5 6 7 14 1 TREMONT STREET WIDENING PE M6610, TIB 9W-153-(001)-1, SR16 to Bethel Ave. 02. 16 CG Widen road, 3 to 4 lanes, add sidewalks east of PS RIW Boulevard, improve drainage. 14 TW CONST TOTAL 17 2 MITCHELL AVENUE RECONSTRUCTION PE TIB 9W-153 (002) 03 0.6 CG Say Street to SR 160 RIW Reconstr ct.roadway and base, replace sidewalks, PS TW CONST improv drainage, overlay roadway, construct sidewalks. TOTAL 14 3 PORT ORCHARD BOULEVARD PE SR 160 to Tremont Street 04 1.0 Improve drainage, overlay roadway, CG RNV provide pedestrian and bikeways. 05 TW CONST TOTAL SIDNEY AVENUE PE 14 4 Tremont to SR16 04 1.0 CG R1W Overlay roadway, construct shoulders for bikes and pedestrians, improve drainage. 05 TW CONST TOTAL 14 5 POTTERY AVENUE PE Lippert Street to Tremont Street 04 CG- RIW Widen from 2 to 3 lanes, overlay roadway, .5 PS construct shoulder for bikes and pedestrians. 05 CONST I DOT Fore, 14a049 Revered SM Sir Year Transportation Irr ",rovement Program 14 9—. 4 to 19 s9 Hearing Date 12 July 1993 Adoption Date 1 _ u �y 1993 Resolution No... 1641__ PROJECT COSTS IN THOUSANDS OF DOLLARS MONTH/ YEAR PHASE STARTS 8 FUND SOURCE INFORMATION EXPENDITURE (Local SCHEDULE Agency) FEDERAL FUNDING LOCAL 11 120 20 50 50 34 RAP CAPP TIA UATA OTHER 12 1,380 380 250 200 136 TOTAL 13 1,500 400 300 250 170 FEDERAL COST BY PHASE 9 FEDERAL FUND CODE 10 1 st 14 1,500 400 2nd 15 3rd 16 300' 4th THRU 6th 17 250 170 03/94 92 T 05/94 95 T 02/96 25 STP 05/96. 225 STP 07/96 U r230 05/97 U 07/97 250 20 U 5/98 130 U 150 TOTAL 1i41ribulion: 2 Capis� - petrid Local Prograrte Engineer , 1C,opy C.R.A.B. {Caurrt"S onlyj , 1 • Copy M.P.O. • Supersedes Previous Editions