Loading...
1605 - Resolution - Six-Year Transportation Improvement ProgramRESOLUTION NO. 1605V A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON ADOPTING THE SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM FOR THE YEAR 1993 - 1998. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, AS FOLLOWS: THAT: The six -year construction portion of the Six -Year Transportation Improvement Program for the years 1993 - 1998, a copy of which is attached hereto and marked Exhibit "A" and is an integral portion of the Six -Year Comprehensive Street program for the City of Port Orchard is hereby adopted. PASSED by the City Council of the City of Port Orchard, APPROVED by the Mayor and attested by the Clerk in authentication of such passage this 13th day of July, 1992. LESLIE J. WEATHERILL, MAYOR ATTEST: P ricia Hower, City 0lerk CITY PORT ORCHARD SIX YEAR TRANSPORTATION IMPROVEMENT PROG 1993 1998 Hearing Date JULY 13 1992 PS 1 City 1000 Adoption Date JULY 13 1992 Coun i$ Resolution No. F P PROJECT IDENTIFICATION m T CIFI PROJECT COSTS IN THOUSANDS OF DOLLARS 1 I li IN THOUSANDS S II U r a 0 AIUI I I 1 I II 11 N i DESCRIPTION OF WORK jo work T L RIH[ OBLIGATION ITOTAL I FUNDING SOURCE I I [IFEDERAL OBLIGATIONII C o f code A E RID[ SCHEDULE I I ----------------------- I 1 11 PLAN II TC r (Street name or number, c (s) L N YI I Y E A R ]FUNDS I IFEDERAL I CAPP, I [FEDERAL I1------------------ 11 NL i Co. road name or number, lw G OISI - - - - - - - - - I ILocall I RAP, IUTILITYIAID 11 IFIRST 12ND II LA t termini beginning & end. ao T VITI1st 2nd 3rd 5TH I I IProg/Amti TIA, [CODES 1PROJECT II IYEAR ITHRU 11 c __ Describe work to be done.) sr H EIAI & & I I I I DATA I INUMBER 11 JANNUAL16TH Ii sk RITI 4TH 6th I I I IProg/Amt1 1 11 IELEMT.IYEARSII 1 2 3 4 1 5 6 17181 9 10 11 12 1 13 1 14 1 15 1 16 117 I18 11 119 120 11 14 1 BETHEL ROAD WIDENING 2 ABDH 0.9 X F 478 ------------------------------------------------- 478 172 FADS/306 CGPTW M-6609 11------------------ 11 IIP.E. I 1 11 Lund Road to Mile Post 0.8, 1125 Bethel Ave IIR/W I 1 11 Widen road to three lanes with shoulders f1CONSTI 478 1 1I and improve drainage. -----------------------------------------------------------------------------------------------------------------------------------------------11------------------11 1ITOTALI 478 1 11 14 2 TREMONT STREET WIDENING 2 ABDH 1.65 X F 1100 1100 88 TIB/1012 CGTPSW M-6610 11P•E• I 1 11 SR 16 to Bethel Avenue TIB-9 IIR/W 1 46 1 11 Widen road, 3 to 4 lanes, add sidewalks W-153-OOIIICONSTI 966 1 11 ----------------- east of Boulevard,improve drainage ------------------------ --------------------------------------------------------------------------------- IITOTALI 1012 1 11 17 3 MITCHELL AVENUE RECONSTRUCTION 4 ABDG 0.6 P 60 440 500 25 ------------------------ TIB/475 CGPTW 6599 11------------------ 11 11P•E• 1 57 1 11 Bay Street to SR 160 TIB-9 IIR/W I 1 11 Reconstruct roadway and base, replace sidewalks W-153-00211CONSTI 418 1 11 improve drainage, add signal .--------------------------------------------------------------------------------------------------------------------------------------------I1------------------I 11TOTALI 475 1 11 14 4 PORT ORCHARD BOULEVARD 5 DG 1 U 20 20 100 100 240 240 CGPT i 11P.E. I 1 II SR 160 to Tremont Street ]IR/W I 1 1I Improve drainage, overlay roadway i1CONSTI 1 11 --------------------------------------------------------- construct sidewalks ------------------------------------------------------------------------- =--------------- 1ITOTALI 1 11 11------------------li 5 STREET PAVING PROGRAM 5 D P 20 20 20 20 80 80 IIP-E- I I 11 Various City streets 11R/W I E 11 Overlay city streets, pave gravel roads as [ICONSTI [ II ------- determined by the City Council ------------------------------------------------------------------------------------------------------------------------------------------11------------------11 IITOTALI 1 11