1605 - Resolution - Six-Year Transportation Improvement ProgramRESOLUTION NO. 1605V
A RESOLUTION OF THE CITY COUNCIL OF
THE CITY OF PORT ORCHARD, WASHINGTON
ADOPTING THE SIX -YEAR TRANSPORTATION
IMPROVEMENT PROGRAM FOR THE YEAR 1993 -
1998.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
PORT ORCHARD, AS FOLLOWS:
THAT: The six -year construction portion of the
Six -Year Transportation Improvement Program for the years 1993
- 1998, a copy of which is attached hereto and marked Exhibit
"A" and is an integral portion of the Six -Year Comprehensive
Street program for the City of Port Orchard is hereby adopted.
PASSED by the City Council of the City of Port
Orchard, APPROVED by the Mayor and attested by the Clerk in
authentication of such passage this 13th day of July, 1992.
LESLIE J. WEATHERILL, MAYOR
ATTEST:
P ricia Hower, City 0lerk
CITY PORT ORCHARD
SIX
YEAR
TRANSPORTATION
IMPROVEMENT PROG
1993
1998
Hearing Date
JULY 13 1992 PS 1
City 1000
Adoption Date
JULY 13 1992
Coun i$
Resolution No.
F
P PROJECT IDENTIFICATION
m
T
CIFI
PROJECT
COSTS
IN THOUSANDS
OF DOLLARS
1 I
li IN THOUSANDS S II
U
r
a
0
AIUI
I
I
1 I
II 11
N
i DESCRIPTION OF WORK
jo
work
T L
RIH[
OBLIGATION
ITOTAL
I FUNDING SOURCE
I I
[IFEDERAL OBLIGATIONII
C
o
f
code
A E
RID[
SCHEDULE
I
I -----------------------
I 1
11 PLAN II
TC
r (Street name or number,
c
(s)
L N
YI I
Y E A R
]FUNDS
I
IFEDERAL I CAPP,
I [FEDERAL
I1------------------ 11
NL
i Co. road name or number,
lw
G
OISI - -
- - - - -
- -
I
ILocall I RAP,
IUTILITYIAID
11 IFIRST 12ND II
LA
t termini beginning & end.
ao
T
VITI1st
2nd 3rd
5TH
I
I
IProg/Amti TIA,
[CODES 1PROJECT
II IYEAR ITHRU 11
c
__ Describe work to be done.)
sr
H
EIAI
&
&
I
I
I I DATA
I INUMBER
11 JANNUAL16TH Ii
sk
RITI
4TH
6th
I
I
I IProg/Amt1
1
11 IELEMT.IYEARSII
1
2
3 4
1 5
6
17181 9
10 11
12
1 13
1 14
1 15 1 16
117 I18
11 119 120 11
14
1 BETHEL ROAD WIDENING
2
ABDH
0.9
X F 478
-------------------------------------------------
478
172
FADS/306
CGPTW M-6609
11------------------ 11
IIP.E. I 1 11
Lund Road to Mile Post 0.8, 1125 Bethel Ave
IIR/W I 1 11
Widen road to three lanes with shoulders
f1CONSTI 478 1 1I
and improve drainage.
-----------------------------------------------------------------------------------------------------------------------------------------------11------------------11
1ITOTALI 478 1 11
14
2 TREMONT STREET WIDENING
2
ABDH
1.65
X F 1100
1100
88
TIB/1012
CGTPSW M-6610
11P•E• I 1 11
SR 16 to Bethel Avenue
TIB-9
IIR/W 1 46 1 11
Widen road, 3 to 4 lanes, add sidewalks
W-153-OOIIICONSTI
966 1 11
-----------------
east of Boulevard,improve drainage
------------------------ ---------------------------------------------------------------------------------
IITOTALI 1012 1 11
17
3 MITCHELL AVENUE RECONSTRUCTION
4
ABDG
0.6
P 60
440
500
25
------------------------
TIB/475
CGPTW 6599
11------------------ 11
11P•E• 1 57 1 11
Bay Street to SR 160
TIB-9
IIR/W I 1 11
Reconstruct roadway and base, replace sidewalks
W-153-00211CONSTI 418 1 11
improve drainage, add signal
.--------------------------------------------------------------------------------------------------------------------------------------------I1------------------I
11TOTALI 475 1 11
14
4 PORT ORCHARD BOULEVARD
5
DG
1
U 20
20 100
100
240
240
CGPT
i
11P.E. I 1 II
SR 160 to Tremont Street
]IR/W I 1 1I
Improve drainage, overlay roadway
i1CONSTI 1 11
---------------------------------------------------------
construct sidewalks
-------------------------------------------------------------------------
=---------------
1ITOTALI 1 11
11------------------li
5 STREET PAVING PROGRAM
5
D
P 20
20 20
20
80
80
IIP-E- I I 11
Various City streets
11R/W I E 11
Overlay city streets, pave gravel roads as
[ICONSTI [ II
-------
determined by the City Council
------------------------------------------------------------------------------------------------------------------------------------------11------------------11
IITOTALI 1 11