1581 - Resolution - Six-Year Transportation Improvement ProgramRESOLUTION NO. 15811�
A RESOLUTION OF THE CITY COUNCIL OF
THE CITY OF PORT ORCHARD, WASHINGTON
ADOPTING THE SIX -YEAR TRANSPORTATION
IMPROVEMENT PROGRAM FOR THE YEAR 1992
- 1998
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
PORT ORCHARD, AS FOLLOWS:
THAT: The six -year construction portion of the
Six -Year Transportation improvement Program for the years
1992 - 1998, a copy of which is attached hereto and marked
Exhibit "A" and is an integral portion of the Six -Year
Comprehensive Street program for the City of Port Orchard is
hereby adopted.
PASSED by the City Council of the City of Port
Orchard, APPROVED by the Mayor and attested by the Clerk in
authentication of such passage this 22nd day of July, 1991.
4 V,/.t=
LESLIE J. WEATHERILL, MAYOR
ATTEST:
Patricia Hower, City Clerk
CITY PORT ORCHARD
SIX
YEAR
TRANSPORTATION
IMPROVEMENT FROG
1992
1997
Hearing Date
JULY 22 1991 Pg 1
City 1000
Adoption Date
JULY 22 991
Coun 18
Resolution No.
1581
F
P PROJECT IDENTIFICATION
m
T
CIFI
PROJECT
COSTS
IN THOUSANDS
OF DOLLARS
I I
II IN THOUSANDS S 11
U
r
a
0
A1U1
I
1
I I
11 II
N
i DESCRIPTION OF WORK
jo
work
T L
RINI
OBLIGATION
ITOTAL
I
FUNDING SOURCE
I I
]]FEDERAL OBLIGATIONII
C
o
f
code
A E
RID1
SCHEDULE
I
I -----------------------
I 1
11 PLAN II
TC
r (Street name or number,
c
(s)
L N
YI I
Y E A R
]FUNDS
I
IFEDERAL I CAPP,
I IFEDERAL
11------------------ 11
NL
i Co. road name or number,
lw
G
01SI - -
- - - - -
- -
I
ILocall I RAP,
IUTILITYIAID
11 IFIRST 12ND II
LA
t termini beginning & end.
ao
T
VITI1st
2nd 3rd
5TH
I
I
]frog/Amt] TIA,
ICODES ]PROJECT
II IYEAR ITHRU 11
S
y Describe work to be done.)
sr
H
EIAI
&
&
I
I
I I UATA
I ]NUMBER
11 JANNUAL16TH 11
S
No
sk
RITI
4TH
6th
I
I
I. IProg/Amtl
1
11 IELEMT.IYEARSII
1
2 3
4
1 5
6
17181 9
10 11
12
1 13
1 14
1 15 1 16
117 118
11 119 120 II
-------------------------------------------------------
14
.-------------
1 BETHEL ROAD WIDENING
2
ADDH
---------------------------
0.9
X F 345
...
-----------------------------------------------
345
76
FAUS/287
CGPTW M-6609
11------------------ 11
IIP.E. I 1 11
Lund Road to Mile Post 0.8, 1125 Bethel Ave
11R/W I 1 11
Widen road to three lanes with shoulders
11CONSTI 287 1 11
and improve drainage.
--------------------------------------=-------------------------------------------------------------------------------------------------11------------------11
1170TALI 28T 1 11
14
2 TREMONT STREET WIDENING
2
ABDH
1.65
X F 200
1100
1300
170
TIB/1130
CGTPSW M-6610
[]P.E- I 1 11
SR 16 to Bethel Avenue
TIB-9
IIR/W 1 185 1 11
Widen road, 3 to 4 lanes, add sidewalks
W-153-00111CONSTI
945 1 II
east of Bouleverd,improve drainage
11TOTALI 1130 1 II
i7
3 MITCHELL AVENUE RECONSTRUCTION
4
ABDG
0.6
------
P 60
440
-----------------------------------------------------11------------------
500
25
TIB/475
CGPTW 6599
11
11P.E. 1 57 I 11
Bay Street to SR 160
TIB-9
11R/W I 1 11
Reconstruct roadway and base, replace sidewalks
W-153-00211CONSTI
418 1 11
improve drainage, add signal
11TOTALI 475 1 11
--------------------------------------------------------------------
14
4 PORT ORCHARD BOULEVARD
5
DG
1
U 20
300
320
50
T 270
CGPT
IIP•E- I I II
SR 160 to Tremont Street
IIR/W I 1 11
Improve drainage, overlay roadway
IICONSTI I II
----------------------------------------------------^
construct sidewalks
11TOTALI 1 11
R
1
--a
E
P0 C- -0
ro C O
J
K r+
C ry O
N S
n
0 sv
2 0-
5 STREET PAVING PROGRAM 5 D P 20. 30 40 90 90 IIP-E- 1 F] 11 � �C
Various City streets IIR/W 1 1 11 �C—o O
Overlay city streets, pave gravel roads as IICONSTI 1 11
determined by the City Council 11TOTALI 1 11 n
----------------------------------------------------------------------------------------------------------------------------------------11.......------------_ I f