Loading...
062-19 - Ventilation Power Cleaning, Inc. - ContractCITY OF PORT ORCHARD SMALL WORKS OVER 35K CONSTRUCTION CONTRACT NO. CO62.I9 PUBLIC WORKS PROJECT NO. PW2O19.OIO THIS Agreement is made effective as of the I lth day of ,2019, by and between ctTy oF poRT oRCHARD, WASHINGTON (*CITY') 216 Prospect Street Port Orchard, Washington 98366 Contact: Mayor Robert Putaansuu Phone: 360.876.4407 Far<: 360.895.9029 and Ventilation Power Cleaning, Inc. 3914 Leary Way NW, Seattle WA 98107 ("CONTRACTOR") Contact: Janice Benner, President Phone:206.634.2750 Fax: 206.634.2753 for the following Project: 2019 STORMWATER L',ATCH BASIL| & ptpE MAINTENANCE (..PROJECT") The City and Contractor agree as fbllows: Contract Documents. The Contractor shall complete the Work described in the Contract Documents for the Project. The following documents are collectively referred to as the "Contract Documents": This Agreement signed by the City and the Contractor;a. c b. Division I of WSDOT Standard Specifications for Road. Bridge and Municipal Construction,20l8 edition, together with APWA Supplement (1-99), subject to specific provisions contained within the Public Works Terms and Conditions: The attached Special Provisions. Plans and Specifications: d. Written change orders or orders for minor changes in the Work issued after execution of this Agreement; e. Public Works Terms and Conditions: f. Insurance and Bonding Requirements: and City of Port Orchard and Ventilation Power Cleaning, Inc. Public llrork Project Nct. Pll/2019-010 Small Works Contract No.C062-19 Y Uobs ZUOBS P-R\Pon Orchard. City of\C062-19-Vcnnlation Power Clcaning docx Page I of 15 Rev 7/18/19 g. The bid proposal submitted by the Contractor, except when inconsistent with Contract Documents a-f. The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. These Contract Documents complement each other in describing a complete work. Any requirement in one document binds as if stated in all. The Contractor shall provide any work or materials clearly implied in the Contract even if the Contract does not mention it specifically. 2. Date of Commencement and Substantia Completion Date. The date of commencement shall be September llth 2019. The Contractor shall substantially complete the Work not later than December 3l't 2019, subject to adjustment by' change order. 3. The Contractor shall do all work and furnish all tools, materials, and equipment in accordance with the above described Construction Contract Documents. The Contractor shall provide and bear the expense of all equipment, work, and labor of any sort whatsoever that may be required for the transfer of materials and for constructing and completing of the work provided for in these Construction Contract Documents. except those items mentioned therein to be furnished by the City. 4. Subject to additions and deductions by change order, the construction Contract Sum is the base bid amount of $81,325.00 plus applicable sales tax. The construction Contract Sum shall include all items and services necessary for the proper execution and completion of the work. The City hereby promises and agrees with the Contractor to employ, and does employ the Contractor to provide the materials and to do and cause to be done the work described in the Construction Contract Documents and to complete and finish the same according to the plans and specifications and the terms and conditions herein contained; and hereby contracts to pay for the same at the time and in the manner and upon the conditions provided for in this Contract. 5. The Contractor agrees to comply with all state and federal laws relating to the employment of labor and wage rates to be paid. T'he Contractor agrees to furnish insurance of the types and in the amounts set forth in the Construction Contract Documents. 6. The Contractor agrees to repair and replace all property of the City and all property of others damaged by himself, his employees, and sub-contractors. 7. The Contractor for himself and for his heirs, executors, administrators, successors, and assigns, does hereby agree to the full perforrnance of all the covenants herein upon the part of the Contractor. 8. It is further provided that no liabitity shall attach to the City of Port Orchard by reason of entering into this Construction Contract, except as expressly provided herein. City of Porl Orchard and Ventilation Power Cleaning, Inc. Public ll/orks Project No. PW20l9-010 Small Works Conract No.C062-19 Y Uobs ZUOBS P-R\Pon Orchard, City oflC062- lg-Ventilation Power Cleanrng docx Page 2 of l5 Rev 7/l8i l9 9. Title VI The City of Port Orchard, in accordance with Title Vl of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the Depaftment of Transportation issued pursuant to such Act, must affirmatively insure that its contracts comply with these regulations. Therefore, during the perforrnance of this Agreement, the Contractor, for itself, its assignees, and successors in interest agrees as follows: Comp iance with Regulations: The Contractor will comply with the Acts and the Regulations relative to Nondiscrimination in Federally-assisted programs of the U.S. Department of Transportation, Federal Highway Administration (FHWA), as they may be amended from time to time. which are herein incorporated by reference and made apart of this Agreement. 2. Nondiscrimination: The Contractor, with regard to the work performed by it during this Agreement, will not discriminate on the grounds of race, color, national origin, sex, age, disability, income-level, or LEP in the selection and retention of subconffactors. including procurements of materials and leases of equipment. The Contractor will not participate directly or indirectly in the discrimination prohibited by'the Acts and the Regulations as set forth in Appendix A, attached hereto and incorporated herein by this reference, including employment practices when this Agreement covers any'activity. project. or program set forth in Appendix B of 49 C.F.R. part 2l . 3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding, or negotiation made by the Contractor for work to be performed under a subcontract, including procurements of materials. or leases of equipment, each potential subcontractor or supplier will be notified by the Contractor of the Contractor's obligations under this Agreement and the Acts and the Regulations relative to Non-discrimination on the grounds of race, color. national origin, sex, age, disability, income-level, or LEP. 4. Information and Reports: The Contractor will provide all information and reports required by the Acts, the Regulations and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information. and its facilities as may be determined by the Citv or the FHWA to be pertinent to ascertain compliance with such Acts, Regulations, and instructions. Where any information required of the Contractor is in the exclusive possession of another who fails or refuses to furnish the information, the Contractor will so certiry to the Ciry" or the FHWA, as appropriate, and will set forth what efforts it has made to obtain the information. 5. Sanctions for Noncompliance: In the event of the Contractor's noncompliance with the Non- discrimination provisions of this Agreement, the Cilv will impose such contract sanctions as it or the FHWA may determine to be appropriate, including, but not limited to: l. withholding payments to the Contractor under the Agreement until the contractor complies; and/or 2. cancelling, terminating, or suspending the Agreement, in whole or in part. 6. Incorporation of Provisions: The Contractor will include the provisions of paragraphs one through six in every subcontract. including procurements of materials and leases of equipment, Citt, of Porl Orchard and Ventilation Power Cleaning, Inc. Public ll/orks Project No. PVI/2019-010 Rev 7/18/19 lr:"r!!k'!l,f:::::t,!:;S{=!,?;, j"?,.,,""powerc,eanngdocx Page 3 of 15 unless exempt by the Acts, the Regulations and directives issued pursuant thereto. The Contractor will take action with respect to any subcontract or procurement as the City or the FHWA may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the Contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the Contractor may request the City to enter into any litigation to protect the interests of the City. In addition, the Contractor may request the United States to enter into the litigation to protect the interests of the United States. IN WITNESS WHEREOF. the parties hereto have caused this contract to be duly executed on the date first written above. CITY OF PORT ORCHARD CO Ventilatio Cleaning, Inc. Robert Mayor R By : Wade Anderson Its: Manaser ATTES ENTICATE: Rinearson, MMC, City Clerk APPROVED AS TO FORM: Cates, City Attorney zM,r.S" City of Port Orchard and Ventilation Power Cleaning, Inc. Public lltorks Project No. PlV20l9-010 Small lAorks Contract No.C062-19 Y Vobs ZUOBS P-R\Port Orchard, Cirv o1\C062- 19-Ventilation Power Cleanrng docx Page4ofl5 Rev 7/18/19 l/ ' AU CERTIFICATE AS TO CORPORATE PRINCIPAL I, Janice Benner (Corporate Officer (Not Contract Signer)) certiry that I am the President (Corporate Title). ration r in the Agreement attached hereto; that Wade Anders t Sign eement on behalf of the Contractor, was then Mqnager Title) said Agreement was duly signed for and in behalf of said corporatQgr by authority of its governing body, and is within the scope of its corporatelowers .Corporate Segt .'t t C cer signature (not contract signer) Janice Benner Printed President Title State of Washington County of King Janice Benner (corporate fficer (not contract signer)) being duly sworn, deposes and says that he/she is President (Corporate Title) of Ventilation Power Cleaning, Inc. (Name qf Corporation) Subscribed and sworn to before me this 28th day of August 2019 Valerie Lescantz Notary Public (Print) My commission expi res 06/0 | 12022 City of Port Orchard and Ventilation Power Cleaning, lnc. Public Worl<s Project No. PW20l9-010 Small Works Contract No.C062-19 Y UobsZUOBS P-R\Port Orchard. City oflC062-19-Ventilation Po*er Cleaning docx Page 5 of 15 Rev 7/18/19 CITY OF PORT ORCTIARD PUBLIC WORK PROJECT TERMS AND CONDITIONS The following terms and conditions shall be used in conjunction with the Standard Specifications for Road, Bridge and Municipal Construction, 2018 edition, together with the APWA Supplement (Section l-99), as issued by the Washington State Department of Transportation and American Public Works Association. Washington State Chapter,, hereinafter referred to as the "standard specifications". The standard specifications, except as they' may be modified or superseded by these provisions, shall govern all phases of work under this Contract, and they are by reference made an integral part of these specifications and Contract as if herein fully set forth. When the provisions of the standard specification conflict with the terms and conditions as contained herein, the terms and conditions shall prevail. I . BID PRICE: The bid price(s) shall include all necessary permits. fees and items of labor, material, equipment, tools, overhead and compensation, supplies, taxes, utilities and other incidentals necessary to complete the work in a fully functional and operational state. All prices including bid prices are in US funds. 2. DEFINITIONS: 'l'he term "City" means Port Orchard, Washington. "successful bidder" means the apparent lowest and best responsible bidder to whom an award is made, and "Contractor" means the successful bidder who has satisfied the requirements for the award and who receives a contract executed by the City. "Bidder" means the person, firm or corporation that has made an offer in response to the invitation to bid. "Work" means the construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by the Contractor to fulfill the Contractor' s obligations. 3. LICENSING AND REGISTRATION: The Contractor must have a washington State certificate of registration per chapter 18.27 RCW; a current state unified business identifier number; and if appticable, industrial insurance coverage for the bidder's employees working in Washington, an Employment Security Department number, and a state excise tax registration number. In addition, the bidder must not be disqualified from bidding on Emy public works contracts under RCW 39.06.010 or 39.12.065(3). 4. pUBLIC WORK REQUIREMENTS: This project constitutes a public work under state law. Bidders are warned to take into consideration statutory legal requirements, particularly, the payment of prevailing wages and fringe benefits, payment and performance bonds and sales tax implications in making their bids. It is the sole responsibility of the bidder to insure that the appropriate labor classification(s) are identified and that the applicable wage and benefit rates are taken into consideration when preparing their bid according to these specifications. The Contractor shall complete and file State of Washington, Department of Labor & lndustries, Statement of Intent to Pay Prevailing Wages and Atfidavit of Wages Paid forms and shall familiarize itself with their requirements. The Contractor shall also be responsible for and pay all costs pertaining to the processing of these fbrms. 5. INSURANCE REQUIREMENT: The successful bidder will furnish insurance as stipulated in the Attachment entitled'olnsurance Requirements." 6. RECEIPT OF ADDENDA: All official clarifications or interpretations of the bid documents will be by written addenda only. City of Port Orchard and Ventilalion Power Cleaning, Inc. public ll/orks Project No. Pl/2019-010 Rev 7/18/19 Small lltorks Contract No.C062-19 Y Vobs ZUOBS P-R\Pod Orchard, Cit-v oflCo62-19-Ventilation Power Cleanins docx 6 Of I 5 7. PROJECT COMPLIANCE: In compliance with the request for quotation, Bidder hereby proposes to perform all work for this project in strict accordance with the Contract Documents, at the Contract Sum, ffid within the time set forth herein with the understanding that time is of the essence in the performance of this Contract. 8. TAXES: Proposals shall include all applicable taxes except sales ta,x, which is a separate bid item. It shall be the Bidder's responsibility to furnish Federal Excise Tax Exemption Certificate, when applicable. 9. ERROR IN EXTENSION: Unit price, when used, shall govern in case of extension error. 10. PERMITS AND FEES: The Contractor shall furnish all permits, inspection fees, and fees required in the performance of this Contract, including those charged under RCW 39.12.070 by the Department of Labor and Industries for the approval of statements of intent to pay prevailing wages and the certification of affidavits of wages paid, etc. The Department may also charge fees to persons or organizations requesting the arbitration of disputes under RCW 39.12.060. The Contractor is responsible for all fees resulting from these statutes. 1 l. CONTRACT: The Contract, when properly signed, will be the only form that will be recognized by the City as an award. The executed Contract supersedes all previous communications and negotiations, except as referenced herein, and constitutes the entire agreement between the City and Contractor (parties), except as provided herein. The Contractor shall not make any changes. alterations, or variations in the terms of the Contract without the written consent of the City. No terms stated by the Bidder in its proposal shall be binding on the City unless accepted in writing by the City. The successful bidder may not assign the Contract resulting from this invitation to bid without the City's prior uritten consent. No waiver by the City of a breach of any provision of the terms and conditions outlined in the invitation to bid shall constitute a waiver of any other breach of such provision or of any other provisions. 12. CHANGE ORDERS: If the City or the Contractor requests a change in the Work, or either party believes that a change is necessary, then the parties shall comply with the following procedure to document and reflect a change in the Work: (a) The party requesting the change shall write a description of the change and give the description to the other party (the "Change Notice"); (b) Before proceeding with the change in Work. unless otherwise excused by emergency, the Contractor shall provide the City with a fixed-price written estimate of the cost and time impact of the change in Work; and (c) The City and the Contractor shall execute a Change Order confirming their agreement as to the change in Work, the fixed-price cost, and the extension of the Substantial Completion Date, if any. tf the change in Work cannot be performed on a fixed-price basis, the Change Order shall identifu the agreed method of compensation. 13. CHANGE DIRECTIVES: A "Change Directive" is a written order signed by the City. directing a change in the Work prior to agreement on adjustment. if any, in the Contract Sum or Substantial Completion Date, or both. The City may by Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Substantial Completion Date being adjusted accordingly.A Change Directive shall only be used in the absence of total agreement on the terms of a Change Order. Upon receipt of a Change Directive, the Contractor shall promptly proceed with the change in the Work and advise the City of its agreement or disagreement with the proposed method for determining the proposed adjustment in the Contract Sum and/or Substantial Completion Date, if any. provided in the Change Directive. A Change Directive signed by the Contractor indicates agreement with all terms set forth in the Change Directive. City of Port Orchard and Venlilation Power Cleaning, lnc Public W'ork Project No. Pll/2019-010 Rev 7/18/19 lr:!!,K::;*"s::!:#fLl3.s*u,1,;i,?,*,"" po*er c ean n3 d,xx 7 0f r 5 Such agreement shall be effective immediately and shall be recorded as soon as practical with a Change Order. If the parties are unable to agree on an adjustment to the Contract Sum and/or Substantial Completion Date, if any, then either party may submit the matter for determination in accordance with Section 2l . 14. MINOR CHANGES IN THE WORK: The City shall have the authority to order minor changes in the Work not involving adjustment in the Contract Sum or extension of the Substantial Completion Date and not inconsistent with the Contract documents. The Contractor shall promptly carry out such written orders for minor changes in the Work. 15. COMPLIANCE WITH [.AWS AND REGLJI.ATIONS: The Contractor warrants full compliance with all appticable local, state or federal laws and regulations and agrees to indemniff and defend the City against any loss, cost, liability or damage, including reasonable attorney's fees, by reason of successful bidder's violation of this paragraph. 16. INDEMNIFICATION: All services to be rendered or performed under this Contract will be rendered or performed entirely at the Contractor's owrl risk. The Contractor shall defend, indemniff and hold the City. its offrcers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in connection with the perforrnance of this Contract. except for injuries and damages caused by the sole negligence of the City. Should a court of competent jurisdiction determine that this Contract is subject to RCW 1.24.1 15. then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City. its officers, officials, employees and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. It is further specifitally and expressly understood that the indemnification provided herein constitutes the Contractor's waiver of imrnunity under Industrial Insurance, Title 5l RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Contract. 17. TERMINATION: This Contract may be terminated in whole or in part, without penaltv' under the fotlowing conditions: l) by mutual written agreement;2) by the City for breach by the Contractor of *y of the obligations or requirements set forth in the Contract Documents which would, at the option of the City. require the Contractor to assume liability for any and all damages, including the excess of re-procuring similar products or services; 3) for convenience of the City; or 4) by the City for non-appropriation of funds. l g. TERMINATION By THE CITY WITHOUT CAUSE: Notwithstanding any other provisions contained herein, the City, without cause, may terminate the Contract between the parties by providing notice to the Contractor. Upon termination under this section: I ) All remaining-obligations of the parties are discharged, but any right based upon breach or perforrnance o...roing prior to termination survives: 2) lf the reasonable costs of performance incurred by the Contractoi prior to termination exceed the amount paid by the City to the Contractor on the Contract Sum. the City shall reimburse the Contractor in the amount of such excess; 3) If the amount paid by the City to the Contractor on the Contract Sum exceeds the reasonable costs of performance incurred by the Contractor prior to termination, the Contractor shall reimburse the City in the amount of such excess; and 4) Any funds obtained or retained by the Contractor as provided in subsections 2) or 3), above, shall constitute full payment and consideration for the services performed by the Contractor prior to termination. City of Port Orchard and Ventilation Power Clectning, lnc. Public llorl<s Project No. PlY20l9-010 Small llrorks Contracl No.C062-19 Y Uobs ZUOBS P-R\Port Orchard. Ciw oAC062-1g-Ventilation Power Cleaning docx Page 8 of l5 Rev 7i l8i l9 19. COMPLIANCE WITH TERMS: The City may at any time insist upon strict compliance with these terms and conditions, not withstanding any previous custom, practice, or course of dealing to the contrary. 20. PAYMENT: Contractor shall maintain time and expense records and provide them to the City along with monthly invoices in a format acceptable to the City for work performed to the date of the invoice. All invoices shall be paid by the City within 45 days of receipt of a proper invoice. If the services rendered to not meet the requirements of the Contract, Contractor will correct or modifu the work to comply with the Contract. City may withhold payment for such work until the work meets the requirements of the Contract. 21. DISPUTE RESOLUTION: In the event there is a dispute between the parties, the parties agree to resolve that dispute in the following manner: (a) The parties shall attempt in good faith to resolve any dispute promptly through negotiation. Either party may give the other party written notice that a dispute exists (a "Notice of Dispute"). The Notice of Dispute shatl include a statement of such parfy's position. Within ten (10) days of the delivery of the Notice of Dispute, the parties shall meet at a mutually acceptable time and place and attempt to resolve the dispute; (b) If the parties are unable to resolve the dispute, they may elect to submit the dispute to mediation. The cost of the mediation shall be borne equally by the parties. The mediator shall be selected by the mutual agreement of the parties; (c) If the mediation does not result in a settlement of the dispute. the dispute shall be settled by binding arbitration by the Judicial Arbitration and Mediation Sen'ices ("JAMS") in accordance with the then operative construction rules of JAMS. The parties may select an arbitrator by mutual agreement, or if unable to agree, the arbitrator will be selected pursuant to the rules of JAMS. The parties shall be bound by the decision of such arbitrator. The arbitration shall be conducted in Kitsap County, Washington; provided, if JAMS is unable to conduct the arbitration in Kitsap County, then the arbitration shall be held in such location as the parties may agree after consulting with JAMS. City of Port Orchard and l/entilation Power Cleaning, Inc. Public lVorlrs Project No. PlY20l9-010 Small ll/orks Contract No.C062-19 Y Uobs ZUOBS P-R\Port Orchard, City oflC062-!9-Ventilation Porer Clcaning docx Page 9 of l5 Rev 7/18/19 CITY OF PORT ORCHARD INSURANCE REQUIREMENTS The Contractor shall procure and maintain for the duration of the Contract with the City, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees and subcontractors. No Limitation. The Contractor's maintenance of insurance, its scope of coverage and limits as required herein shall not be construed to limit the liability of the Contractor to the coverage provided by such insurance, or otherwise limit the City's recourse to any remedy available at law or in equity. Minimum of Insurance.The Contractor shall obtain insurance of the types described below: Automobile Liabilitl, insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (lSO) form CA 00 0l or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. Commercial General Liability insurance shall be written on [SO occurrence form CG 00 0l and shall cover liability arising from premises, operations, stop gap liability, independent contractors, products-completed operations, personal injury and advertising injury and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 1 I 85 or an equivalent endorsement. There shall be no endorsement or modification of the Commercial General Liability lnsurance for liability arising from explosion, collapse or underground property damage. The City shall be named by endorsement as an additional insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO Additional Insured endorsement CG or substitute endorsements providing equivalent coverage. a a City of Port Orchard and Ventilalion Power Cleaning, Inc. Public lAorks Project No. PlV20l9-010 Small Works Contract No.C062-19 Y Uobs ZUOBS P-R\Pon Orchard. City ofiC062-1g-\'enolarion Power Cleanrng docx Page l0 of 15 o o Workers' ()ompensation coverage as required by the Industrial Insurance laws of the State of Washington. Builders Rist insurance covering interests of the City, the Contractor, Subcontractors, and Sub-subcontractors in the work. Builders Risk insurance shall be on an all-risk policy form and shall insure against the perils of fire and extended coverage and physical loss or damage including flood. earthquake, theft, vandalism, malicious mischief, collapse, temporary buildings and debris removal. The Builders Risk insurance covering the work will have a deductible of $5,000 for each occurrence, which will be the responsibility of the Contractor. Higher deductibles for flood and earthquake perils may be accepted by the City upon written request by the Contractor and written acceptance by the City. Any Rev 7/18/19 increased deductibles accepted by the City will remain the responsibility of the Contractor. The Builders Risk insurance shall be maintained until final acceptance of the work by the City. Employer's Liabiliry insurance limit of $1,000,000 each accident. Employer's Liability Disease each employee $1,000,000 and Employer's Liability Disease - Policy limit $ I ,000.000. Minimum Amounts of Insurance. The Contractor shall maintain the following insurance limits: Automobile Liabiliry insurance with a minimum combined single limit for bodily injury and property damage of $ 1,000.000 per accident. Commercial General Liability insurance shall be written with limits no less than $ 1,000,000 each occwrence. $2,000,000 general aggregate and a $2,000,000 products- completed operations aggregate limit. Builders Rrsfr insurance shall be written in the amount of the completed value of the project with no coinsurance provisions. a a a a Other Insurance Provisions. The Contractor's Automobile Liability, Commercial General Liability and Builders Risk insurance policies are to contain, or be endorsed to contain that they shall be primary insurance as respects the City. Any insurance, self-insurance or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. If any'coverage is written on a "claims made" basis, then a minimum of three (3) year extended reporting period shall be included with the claims made policy, and proof of this extended reporting period provided by the City. Contractor's Insurance for Other Losses. The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools. including but not timited to the Contractor's employee-owned tools, machinery, equipment or motor vehicles owned or rented by the Conffactor, or the Contractor's agents, suppliers or contractors as well as any temporary structures, scaffolding and protective fences. Waiver of Subrosation. The Contractor waives all rights against the City, any of its Subcontractors, Sub-subcontractors, agents and employees, for damages caused by fire or other perils to the extent covered by Builders Risk insurance or other property insurance obtained pursuant to this Insurance Requirements Section of the Contract or other property insurance applicable to the work. The Contractor's insurance shall be endorsed to waive the right of subrogation against the Citv, or any self-insurance, or insurance pool coverage maintained by the City. The City will not waive its right to subrogation against the Contractor. The Contractor's insurance shall be endorsed acknowledging that the City w'ill not waive its right to subrogation. Acceptabi litv of [nsurers. Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. City of Porl Orchard and Venlilation Power Cleaning, lnc. Public lltork Project No. PW20l9-010 Small Works Contract No.C062-19 Y Uobs ZUOBS P-R\Port Orchar( City oflC062-19-Ventilatisr Poler Cleaning docx Page I I of15 Rev 7/18/19 Verification of Coverase. The Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the Automobile Liability, and Commercial General Liability insurance of the Contractor before commencement of the work. Before any exposure to loss may occur, the Contractor shall file with the City a copy of the Builders Risk insurance policy that includes all applicable conditions, exclusions, definitions, terms and endorsements related to this project. Subcontractors.The Contractor shall have sole responsibility for determining the insurance coverage and limits required, if any, to be obtained by subcontractors, which determination shall be made in accordance with reasonable and prudent business practices. Notice of Cancellation. The Contractor shall provide the City and all Additional Insureds for this work with written notice of any policy cancellation, within two business days of their receipt of such notice. Failure to Maintain Insurance. The insurance required by this Section will not be canceled, materially changed or altered without forty-five (45) days prior written notice submitted to the Ciry. Failure on the part of the Contractor to maintain insurance as required shall constitute a material breach of contract, upon which the City may, after giving five business days' notice to the Contractor to correct the breach, immediately terminate the Contract, or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand. or at the sole discretion of the City, offset against funds due the Contractor from the City. City of Port Orchard and Ventilation Power Cleaning, Inc. Public lltorks Project No. PW20l9-010 Small Works Contract No.C062-19 Y Uobs ZVOBS P-R\Pon Orchard. Ciry o^C062-19-Ventilarion Power Cleaning docx Page 12 of 15 Rev 7/ l8/ I 9 CITY OF PORT ORCHARI) DECLARATION OF OPTION FOR PERFORIVIANCE BOND OR ADDITIONAL RETAINAGE Note: Thisform must he submitted at the time lhe Contractor executes the Contract. The Contractor shall designctte the option desired by checking the appropriate space. The Contractor elects to: (l) Furnish a performance bond in the amount of the total contract sum. An executed performance bond on the required form is included rvith the executed contract documents. X (2)Have the City retain, in lieu of the performance and payment bonds, ten percent (10%) of the total contract amount for a period of thirty days after date of final acceptance, or until receipt of all necessary releases from the department of revenue and the department of labor and industries and settlement of any liens filed under chapter 60.28 RCW, whichever is later. RCW 39.08.010. In choosing option 2, the Contractor agrees that if the Contractor, its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract, ffid shall faithfully perform all the provisions of such Contract and shall also well and truly perform and fulfill all the undertakings, covenants, terms, conditions and agreements of any and all duly authorized modifications of the Contract that may hereafter be made, at the time and in the manner therein specified. and shall pay all laborers, mechanics. subcontractors, and materialmen. and a[l persons who shall supply such person or persons, or subcontractors, with provisions and supplies for the carrying on of such work, on his or her part, and shall defend. indemnifu. and save harmless the City of Port Orchard, Washington, its officers and agents from any claim for such payment, then the funds retained in lieu of a perforrnance bond shall be released at the time provided in said fulfills the said obligations.oroption 2; otherwise, the funds shall be retained until the Cont ,7, 4rl ctor Bond No. City of Port Orchard and Ventilalion Power Cleaning, Inc. Public Work Project No. PW20l9-010 Small ll/orks Contract No.C062-19 Y:Uobs ZUOBS P-R\Pon Orchard, City o^C062-1g-Ventilation Power Cleanrng docx Page 13 of 15 ure 0812712019 Rev 7/18/19 ACKNOWLEDGEMENT Corporation, Partnership, or Individual STATE OF Washinglon )ss COUNTY OF King On this 28th day of August 2019, before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and sworn, personally appeared Wade Anderson to me known to be the (check one of the following boxes): x N{anager of Ventilation Power Cleaning. [nc. , the corporation, of the partnership, tr individual, that executed the foregoing instrument to be the free and voluntary act and deed of said ffi corporation, ! partnership, E inAividual for the uses and purposes therein mentioned, and on oath stated that X t. ! she was authoized to execute said instrument. WITNESS my hand and official seal hereto affixed the day and year first above written. Dated:Ausust 28- 2019 tr ','41!4wW ,) Valerie Lescantz Print or type name NOTARY PUBLIC, in and for the State of Washington Residing at:Kins Countv. WA My Commission exp ires:06/0112022 City of Port Orchard and Ventilation Power Cleaning, lnc. Public ll/orks Project No. PlV20l9-010 Small lltorks Contract No.C062-19 Y Uobs ZUOBS P-R\Port Orcher( City oflC062-1g-Ventilarion Power Cleaning docx Page 14 of 15 \otsry Seal with lnk Stemp Rev 7/ I 8/ l9 APPENDIX,{ During tlre perforrnance of this Agreement. the Contractor, ftrr itself, its assignees. ancl successors in interest agrees to comply vvith the follow'ing non-discrinrination statutes and authorities: including but not limited to: Pertinent Non-Discrimi nation Authorities: a o Title Vl of the Civil Rights Acr of 1964 (12 U .S.C. $ 2000d er seq., 78 stat. 252), (prohibits discrimination on the basis of race. color, national origin); and 49 C.F.R. Part 21. The Llniform Relocatiorr Assistance and Real Propert)' Acquisition Policies Act of 1970. (42 U.S.C. $ 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid progranrs and proiects): Federal-Aid tJighway Act of 1973, (23 LI.S.C. S 324 et seq. ), (prohibits discrimination on the basis of sex); Section 504 of the Rehabilitation Act of 1973. (29 [J.S.C. $ 794 et seq.), as amended. (prohibits discrimination on the basis of disabilit-v): and'19 C.F.R. Part27: 1'he Age Discrirnination Act of 1915, as amended. (42 U .S.C. $ 6l0l et seq.). (prohibits discrinrinatiort on the basis of age): Airport and Airway Improvement Act of 1982, (49 tlSC$ 471 . Section 4 7123), as amended. (prohibits discrimination based on race, creed. color, national origin. or sex); The Civil Rights Restoration Act of 1987. (PL 100-209), (Broadened the scope, coverage and applicability of Title Vl of the Civil Riglrts Act of' 1964, fhe Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1913, by'expanding the definition of the tenns "programs or activities" to include alt of the programs or activities of the Federal-aid recipients, sub- recipients and contractors, w'hether such programs or activities are Fcderally funded or not): Titles Il and Ill of rhe Americanswith Disabilities Act, u'hich prohibitdiscriminatiotr on the basis of disabilitl in the operation of public entities. public and private transportation systems. places of public accommodation, and certain testing entities (42U.S.C. $$ l2l3l-121891 as implemented by Department of Transportation regulatiorrs at 49 C.P.R. parts 37 and 38: The Federal Aviation Administration's Non-discrimination statute (49 LI.S.C. $ 47123) (prohibits discrimination on the basis of race. color, national origin. and sex): Executive Order 12898. Federal Actions to Address Envirorrmental Justice in Minority Populations and Lorv-lncome Populations. rvhich ensures discrirninatiott against rninorir,".' populations by discouraging prograrrls, policies. and activities rvith disproportionately high and adv'erse hunran health or environmental effects on minority and low-incolne populations: Executive Order 13166, Irnproving Access to Sen'ices fbr Persons with l.imited English proficiency, and resulting agenc) guidance, national origin discrirnination includes discrirnination because of linrited English proficiency (l-EP). To ensure compliance rvith Title Vl. you must take reasonable steps to -ensure that L-EP persons have nreaningfttl access to your programs (70 Fed' Reg. at 71087 to 74100); Title IX of the Education Amerrdments of 1972. as antended, which prohibits you frottt cliscriminating because of sex in educatit'rn programs or activities (20 tJ.S,C. l68l et seq). o o a o a a a a o a City of Port Orchard and Ventilation Power Cleaning, Inc- Public lYork Project No. PlV20l9-010 Small ll/orl<s Contract No.C062- I 9 Y Uobs ZUOBS P-RrPort Orchard, City oflC062'ls-\'entilation Power Cleening docx Page l5 of 15 Rev 7/18/19