Loading...
1781 - Ordinance - Amending Ordinance 1276 Procedures for Issuance of Installation Permitsi � A NOTICE OF CITY OF PORT ORCHARD ORDINANCE The following is a summary of an Ordinance approved by the Port Orchard City Council at their regular Council meeting held November 22, 1999. ORDINANCE NO. 1781 AN ORDINANCE OF THE CITY OF PORT ORCHARD, WASHINGTON, AMENDING §7 AND §8 OF ORDINANCE NO. 1276 ADOPTING PROCEDURES FOR THE ISSUANCE OF INSTALLATION PERMITS AND AUTHORIZE FEES TO BE ESTABLISHED BY CITY RESOLUTION. Copies of Ordinance No. 1781 are available for review at the office of the City Clerk of the City of Port Orchard. Upon written request a statement of the full text of the Ordinance will be mailed to any interested person without charge. Thirty days after publication, copies of Ordinance No. 1781 will be provided at a nominal charge. City of Port Orchard �-f�JAJ& YWA"' Michelle Merlino Deputy Clerk Publish: Port Orchard Independent December 1, 1999 ORDINANCE NO. 1781 AN ORDINANCE OF THE CiTY OF PORT ORCHARD, WASHiNGTON, AMENDING §7 AND §8 OF ORDINANCE NO. 1276 ADOPTING PROCEDURES FOR THE ISSUANCE OF INSTALLATION PERMITS AND AUTHORIZE FEES TO BE ESTABLISHED BY CITY RESOLUTION. WHEREAS, fees are established for certain Public Works Department permits, applications, and documents; and WHEREAS, the Public Works Department provides a variety of services, which require fees; now, therefore, THE COUNCIL OF THE CITY OF PORT ORCHARD DOES HEREBY ORDAIN AS FOLLOWS: SECTION 1. Fees for departmental permits, application and documents listed in Exhibit "A°, shall be established by City Resolution. SECTION 2. Ordinance No. 1276, Section 7 is amended to read as follows: 15.36.030 Installation Permits —Required —Fee. (1) Prior to the location, relocation, establishment, or initial occupancy of any mobile home/manufactured home, the home owner or authorized representative shall obtain a permit from the Building Department. The fee for the installation permit shall be set by City resolution. (2) A dealer may not deliver a mobile/manufactured home until if has been verified that the owner or the installer has obtained an installation Permit for the home. Each permit issued by the Building Department for a mobile/manufactured home shall be valid until the mobile/manufactured home is moved to another location. (3) The installation permit issued is only for the installation of the mobile/manufactured home. Changes to the basic home or modification to the approved set-up instructions cannot be made. SECTION 2. Ordinance No. 1276, Section 8 is amended to read as follows: 15.36.080 Inspections — Correction of Noncompliance. (1) The installer shall request an inspection after all aspects of the installation, other than installation of the foundation facia, have been completed. If the installation complies with the installation requirements and the condition of the installation permit, the City of Port Orchard shall approve the installation and allow the mobile home to be occupied. (2) If the installation does not comply with the installation requirements and the conditions of the installation permit, the City Building inspector shall provide the installer with a list of corrections that the installer must make. The list of corrections shall state a date by which the corrections must be completed. If the items that require corrections are not complete, a re -inspection fee shall be assessed. The re -inspection fee is set by City Resolution. Ordinance No. 1781 Page 2 of 4 SECTION 3. The Uniform Building Fees are adopted by city ordinance in conjunctiW. with adoption, by reference, of the Uniform Building Codes, SECTION 4 Utility fees and equipment rental fees are not included in Exhibit "A". SECTION 5. State sales tax will be applied to the fees when the preparation of the document or service is completed by other than city personnel. SECTION 6. Severability. If any section, subsection, paragraph, sentence, clause, or phrase of this ordinance is declared unconstitutional or invalid for any reason, such decision shall not affect the validity of the remaining portions of this ordinance. PASSED by the City Council of the City of Port Orchard, APPROVED by the Mayor and attested by the Clerk in authentication of such passage this 22nd day of November 1999. �ZW4�;;2 — ATTEST: LESLIE J. WEATHERILL, MAYOR Pa icia Parks, City dlerk APPROVED AS TO FORM: row City ., , t J1 SPONSORED BY: Councilmign Geiger • • Exhibit "A" DESCRIPTION Short Plat Short Plat Amendment Preliminary Subdivision Plat Final Plat, Subdivision Lot Line Adjustment Environmental Checklist Review SEPA Exemption SEPA Appeal EIS Review Substantial Development Permit Conditional Use Permit, Shorelines Variance, Shorelines Shoreline Exemption SDP Revision Master Program Amendment SDP Extension Comprehensive Plan Amendment Rezone Variance Variance (Administrative) Special Use Permit Conditional Use Permit Planned Residential Development Temporary Use Permit Pre -Application Conference Formal Land Use Determination Drainage Plan Evaluation Petition to vacate right of way Sign Permit Home Occupation permit Mobile Home Inspection In a Mobile Home Park Mobile Home Inspection On a residential lot Mobile Home Re -inspection Site Plan Review Less than $25,000 value Site Plan Review $25,000 to $49,999 Ordinance No. 1781 Page 3 of 4 • • Site Plan Review $50,000 to $499,000 Site Plan Review $500,000 plus Street Excavation Permit Concurrency Fees Stormwater Review, Minor Stormwater Review, Major Stormwater Permit, Minor Stormwater Permit, Major Any action requiring a public hearing or meeting, such as re -considerations or revisions. Zoning Ordinance Zoning Procedures Zoning Map Developers Handbook Comprehensive Plan Comprehensive Plan Maps Tremont Corridor Specific Shoreline Master Program Blackjack Creek Management Plan Ross Creek Management Plan Critical Area Designations Wet Lands Inventory Sewer Comp Plan Water Comp Plan Stormwater Manual Parks Camp Plan Capital Facilities Comprehensive Plan Ordinance No. 1781 Page 4 of 4