Loading...
1738 - Ordinance - Amending Ordinance No. 1635 Road Pavement RequirementsCity of Port Orchard 216 Prospect Street Port Orchard, WA 98366 Amended by Ord. 1851, March 25, 2002 3129476 Page: 1 of 111111111111111111111111111111 1@/301199511:06A FuRT._<7RCH8IMs.1JY 01 1RD_ 112.00 Kit.sap Co, WA ORDINANCE NO.1738 AN ORDINANCE OF THE CITY OF PORT ORCHARD, WASHINGTON AMENDING ORDINANCE NO. 1635 BY ALLOWING THE REVISION IN THE SIDEWALK, AND THE CROSS SECTION OF THE ROAD PAVEMENT REQUIREMENTS. Tax Account No.: 252401-4-030-2004 and 252401-4-055-2004 LEGAL DESCRIPTION: Section 25, Township 24, Range 01 E Full legal attachment "A" WHEREAS, Ordinance No. 1635 approved a Preliminary Plat as submitted by Jim James for Rockport Subdivision with 33 conditions, and WHEREAS, the Council of the City of Port Orchard did hold a Public Hearing on March 23, 1998 adopting Ordinance No. 1719 authorizing a one year extension for the Final Plat of Rockport Subdivision, and WHEREAS, Jim James subsequently petitioned the City Council of the City of Port Orchard for a revision in the sidewalk and the cross section of the road pavement requirements of Ordinance No. 1635, and WHEREAS, the City Council of the City of Port Orchard held a public hearing on August 24, 1998 to hear testimony and public input on the requested revision in the sidewalk and the cross section of the road pavement requirements of Ordinance No. 1635, and WHEREAS, the City Council of the City of Port Orchard concluded that granting these modifications would not be detrimental to the health, safety, morals and general welfare of the community, now, therefore, THE CITY COUNCIL OF THE CITY OF PORT ORCHARD, WASHINGTON, DOES HEREBY ORDAIN AS FOLLOWS: That Ordinance No. 1635 is hereby modified as follows with the addition of Conditions No. 34 and 35: No permanent sign shall be erected without prior approval from the Planning Department and issuance of a building permit. 1 Ordinance No. 1738 Page 2 of 4 2. A minimum of one street tree with a minimum height of 4 feet and 2.5 inches in diameter shall be installed within the front yard of each lot prior to the issuance of a Certificate of Occupancy. 3. A minimum of two street trees with a minimum height of 4 feet and 2.5 inches in diameter shall be installed within the front yard on each duplex unit, one in front of each residence, prior to the issuance of a Certificate of Occupancy. 4. The Final Plat shall indicate Tract A as open space and list the land use restrictions against construction in this area. This area should be deeded to the Homeowners Association. 5. No grading will be done in Tract A except for the construction of the bioswales. All trenches will be hydroseeded at the conclusion of the pipe installation. 6. The lots will be restricted to single family residences and three duplexes. 7. All water designs shall be approved by the Annapolis Water District prior to construction. Inspections of the water system shall be accomplished by Annapolis Water District. 8. Water connection policies will be determined by the Annapolis Water District. 9. All water system improvements will be complete prior to Final Plat approval. 10. All sewer designs shall be approved by Kitsap County Sewer District #5 prior to construction. Inspections of the sewer system shall be accomplished by Sewer District #5. 11. Sewer connection polices will be determined by the Kitsap County Sewer District #5. 12. All sewer system improvements will be complete prior to Final Plat approval. 13. The streets are to meet City standards and shall be dedicated to the City as public right- of-way. 14. All streets will be paved with sidewalks in place prior to Final Plat approval. 15. This project will accommodate pedestrians with a five foot wide concrete sidewalk with a six inch high curb on the west side of Olney for the full frontage of the subdivision, prior to the approval of the Final Plat. 16. The cast in place concrete sidewalk with curb shall be constructed from 3,000 psi concrete for all the sidewalks including along Olney Avenue. 17. The City Clerk will confirm the street name and addresses of the lots prior to any excavation permit being issued. 18. A lighting plan shall be submitted and deemed acceptable to Puget Power standards and to the City Engineer prior to placement of any outdoor illumination. As a minimum, street illumination should be located at the entrance/exit and lots 10 and 42. 3129476 Page: 2 of 5 1D,'30'lyaa 11 0fh PORT ORCHARD CITY OF ORD $12 6@ Kitsap Co, WA Amended by Ordinance 1758 Section(s) Amended._ Date: 03-08 -99 Ordinance No. 1738 Page 3 of 4 19. The required 5 foot utility easements on both sides of the road will be clearly shown. 20. The Developer should provide the City with $650.00 to pay for the following signs and posts: 1 Street sign 6 No Parking signs 4 One way signs 2 Do Not Enter signs 21. The stormwater system shall be designed and constructed to meet the Department of Ecology standards that are in effect at the time of the issuance of the excavation permit for the Preliminary Plat. 22. All areas that have been disturbed during construction, but not constructed upon by 1 October of the year shall be hydroseeded to minimize sediment erosion. 23. The stormwater system shall be designed by a professional engineer. 24. All stormwater system improvements will be complete prior to approval of the Final Plat. 25. Prior to Final Plat approval, the developer shall provide a playground area to be owned and maintained by the Homeowners Association. It shall consist of at least a big toy, such as a swing set, jungle gym or other equipment and shall have an impact resistant surface, to the approval of the City Engineer. 26. All lots will be surveyed and recorded. 27. Each lot should have survey markers installed. 28. Fire Hydrants will be constructed in the vicinity of lots 1, 10 and 21. 29. All utilities will be underground. 30. The Post Office may require combination boxes and not allow individual mail boxes. Plans shall show cutouts for these and illustrate that their placement will not obstruct the sidewalks. 31. To reduce the impact to the school system, mitigation fees will be paid at the time of building permit issuance, if the City adopts a general implementing ordinance of the school impact fees prior to the date that a complete building permit application is accepted. The proponent can also mitigate the impact to the school system by negotiating a settlement with the South Kitsap School District. 32. The applicants must meet with Kitsap Transit and provide an area along the Olney right- of-way for a bus stop and shelter as determined by Kitsap Transit. 33. A pedestrian access shall be constructed between the Rockport Subdivision and the proposed development to the north over the sanitary sewer easement joining the two properties. A private easement to protect pedestrian access shall be created and maintained by the Homeowners Association, prior to the Final Plat approval. 3129476 Page: 3 of 5 10130I1999110fiA PORT ORCHARD CITY OF ORD $1? Kitsap Co, WA Ordinance No. 1738 Page 4 of 4 34. The stormwater collected by the curb on Olney Avenue shall be directed to the subdivision's stormwater system. 35. Olney Avenue shall be improved by widening the southbound lane to fifteen feet. PASSED by the City Council of the City of Port Orchard, SIGNED by the Mayor and attested by the Clerk in authentication of such passage this 121h day of October, 1998. LESLIE J. WEATHERILL, MAYOR ATTEST: Patricia Parks, City Clerk APPROVED AS TO FORM: Sponsored by: 17 a� City Attdrn9j Councilman nson 3129476 Page: 4 of 5 10/30/199811:088 PORT ORCHARD CITY OF ORD $12.60 Kitsap Co, WA finance No. 1738 ATTACHMENT A: Parcel 1: Portion of the Northeast quarter of the Southeast Quarter of Section 25, Township 24 North, Range 1 East, W.M., Kitsap County, Washington; except that portion lying South of the following described property: the South 129 feet of the following: The Northeast quarter of the Southeast quarter of the Southeast quarter of Section 25, Township 24 north, Range 1 East. W.M. in Kitsap County, Washington; except the following described tract: Beginning at a point which is north 0?31'47" East 33111.2 feet; thence North 88?29'30" East 667.7 feet to the point of beginning; Except for the East 40 feet for road; Except for county road; and except that portion conveyed to the Kitsap County for Olney Road, by deed recorded under Auditor's File No. 8609020097; and corrected by document recorded under Auditor's 8610220259; situate in Kitsap County, Washington. Parcel 2: The Northwest quarter of the Southeast quarter of the Southeast quarter, Section 25, Township 24 North, Range 1 East, W.M. in Kitsap County, Washington; Except the North 30 feet conveyed to Kitsap County by deed recorded under Auditor's file numbers 890162, 890166, 890167 and 890169; And except that portion conveyed to Kitsap County for Olney Road by deed recorded under Auditor's file no. 8609020097, and corrected by document recorded under Auditor's file no. 8610220259; Situate in Kitsap County, Washington. 3129476 1111111111111111111111111111111111111111111111111111 Page: 5 of 5 10/30/188811:0 PORT ORCHARD CITY OF ORD $12.00 Kitsap Co, WA -98 NOTICE OF CITY OF PORT ORCHARD ORDINANCE The following is a summary of an Ordinance approved by the Port Orchard City Council at their regular Council meeting held October 12, 1998. ORDINANCE NO. 1738 AN ORDINANCE OF THE CITY OF PORT ORCHARD, WASHINGTON AMENDING ORDINANCE NO. 1635 BY ALLOWING THE REVISION IN THE SIDEWALK, AND THE CROSS SECTION OF THE ROAD PAVEMENT REQUIREMENTS. Copies of Ordinance No. 1738 are available for review at the office of the City Clerk of the City of Port Orchard. Upon written request a statement of the full text of the Ordinance will be mailed to any interested person without charge. Thirty days after publication, copies of Ordinance No. 1738 will be provided at a nominal charge. City of Port Orchard Ll-x,(JA& Michelle Merlino Deputy Clerk Publish: Port Orchard Independent October 21, 1998