040-17 - Northwest Cascade, Inc. - Supplement / Change Order 1CITY OF PORT ORCHARD
Authorization for Change Order No.1
Date: July 20, 2017
2017 McCormick Woods
Project: Annual Septic_ Tank_ Pumping
Contract / lob # 040-17
Contractor: Northwest Cascade
104121ohn 8ananola Way E
Puyallup, WA 98373 _
THIS CHANGE ORDER AUTHORIZES (add description).
Delete 5200 McCormick from pumping list. Location has a drain field rather than a septic tank.
Contract History
Amount Sales Tax Total Date Appvd b
Original Contract
$23157.00
See attached
$23,157.00
13-1un-17
Council
Change Order 1
-$279.00
See attached
-$279.00
20-Jul-17
Director
Total Contract $22 878.00
I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and
costs are true and accurate.
Contrgtoi Approval Signature n
Printed Name & TitleOG F
Publi orks Directo /� Engineer
Printed Name
Change Orders that do not exceed 10%or a Approved:
maximum of $50,000 can be approved by the
Public Works Director.
Change Orders that do not exceed 10%or a Attest:
maximum of $100,000 are to be approved by
the Mayor.
Change Orders over $100,000 or exceed a total
of 10% require Council Action.
U\ENGINEERINMEWERVdCCdranck woods septic tanks1 M(117 PumpoittChame 0rtler No t.dQ.
Page 1
Mayor
City
Council Approval Date
��O-11
*vi+r S+ 09swt,
SCHEDULE OFCONTIWCT PRICES
MCCORMICK WOODS ANNUAL SEPTIC TANK PUMPING
NOTE. If a discrepancy between the numerical unit price and the written (words) unit price Is found, the
written (words) unit price shall control
Reis tstknabd Una$
VA Wtv oewynanmaa U*Pdm kw t
L It TAW TAN PUMP"
S]Ltp1{yndrejj - jayZ LAS_ } $�iy. .60
(worth) earEocb
TOTAL BID: s -23, 159M
The City will pay a flat rate (tax included) for each septic tank pumped, as per ft contract The rate per
tank will be inclusive of taxes, labor, equipment, materials and fee costs.