Loading...
040-17 - Northwest Cascade, Inc. - Supplement / Change Order 1CITY OF PORT ORCHARD Authorization for Change Order No.1 Date: July 20, 2017 2017 McCormick Woods Project: Annual Septic_ Tank_ Pumping Contract / lob # 040-17 Contractor: Northwest Cascade 104121ohn 8ananola Way E Puyallup, WA 98373 _ THIS CHANGE ORDER AUTHORIZES (add description). Delete 5200 McCormick from pumping list. Location has a drain field rather than a septic tank. Contract History Amount Sales Tax Total Date Appvd b Original Contract $23157.00 See attached $23,157.00 13-1un-17 Council Change Order 1 -$279.00 See attached -$279.00 20-Jul-17 Director Total Contract $22 878.00 I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. Contrgtoi Approval Signature n Printed Name & TitleOG F Publi orks Directo /� Engineer Printed Name Change Orders that do not exceed 10%or a Approved: maximum of $50,000 can be approved by the Public Works Director. Change Orders that do not exceed 10%or a Attest: maximum of $100,000 are to be approved by the Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. U\ENGINEERINMEWERVdCCdranck woods septic tanks1 M(117 PumpoittChame 0rtler No t.dQ. Page 1 Mayor City Council Approval Date ��O-11 *vi+r S+ 09swt, SCHEDULE OFCONTIWCT PRICES MCCORMICK WOODS ANNUAL SEPTIC TANK PUMPING NOTE. If a discrepancy between the numerical unit price and the written (words) unit price Is found, the written (words) unit price shall control Reis tstknabd Una$ VA Wtv oewynanmaa U*Pdm kw t L It TAW TAN PUMP" S]Ltp1{yndrejj - jayZ LAS_ } $�iy. .60 (worth) earEocb TOTAL BID: s -23, 159M The City will pay a flat rate (tax included) for each septic tank pumped, as per ft contract The rate per tank will be inclusive of taxes, labor, equipment, materials and fee costs.