050-17 - Vikking Fence Company - ContractEDLw V I*.
JUL 3 1 2017
CITY OF PORT ORCHARD SMALL WORKS UNDER 35K
CONSTRUCTION CONTRACT NO.C050-17
PUBLIC WORKS PROJECT NO. PW2017-029
CITY OF PORT ORCHARD
CITY CLERKS OFFICE
THIS Agreement is made effective as of the 20th day of July, 2017, by and between
CITY OF PORT ORCHARD, WASHINGTON (“CITY”)
216 Prospect Street
Port Orchard, Washington 98366
Contact: Mayor Robert Putannsuu Phone: 360.876.4407 Fax: 360.895.9029
and
(“CONTRACTOR”)VIKING FENCE COMPANY
3450 State Hwy 3
Bremerton, WA 98312
Contact: John Rosebeary Phone: 360.373.7918 Email: john@vikingfence.biz
for the following Project:
Public Works Shop Gate & Fence Repair (“PROJECT”)
The City and Contractor agree as follows:
1. Contract Documents. The Contractor shall complete the Work described in the Contract
Documents for the Project. The following documents are collectively referred to as the
“Contract Documents”:
a. This Agreement signed by the City and the Contractor;
b. Division 1 of WSDOT Standard Specifications for Road, Bridge and Municipal
Construction, 2016 edition, together with APWA Supplement (1-99), subject to specific
provisions contained within the Public Works Terms and Conditions.
c. The attached Special Provisions, Plans and Specifications;
d. Written change orders or orders for minor changes in the Work issued after execution of
this Agreement,
e. Public Works Terms and Conditions;
f. Insurance and Bonding Requirements; and
g. The bid proposal submitted by the Contractor, except when inconsistent with Contract
Documents a-f.
City of Port Orchard and Viking Fence Company
Public Works Project No. PW2017-029
Small Works Contract No. C050-17 Rev 6/24/16
Page 1 of 17
The intent of the Contract Documents is to include all items necessary for the proper execution
and completion of the Work by the Contractor. These Contract Documents complement each
other in describing a complete work. Any requirement in one document binds as if stated in all.
The Contractor shall provide any work or materials clearly implied in the Contract even if the
Contract does not mention it specifically.
2. Date of Commencement and Substantial Completion Date. The date of commencement
shall be July 20th 2017. The Contractor shall substantially complete the Work not later than
September 181112017, subject to adjustment by change order.
3. The Contractor shall do all work and furnish all tools, materials, and equipment in
accordance with the above described Construction Contract Documents. The Contractor shall
provide and bear the expense of all equipment, work, and labor of any sort whatsoever that
may be required for the transfer of materials and for constructing and completing of the work
provided for in these Construction Contract Documents, except those items mentioned
therein to be furnished by the City.
4. Subject to additions and deductions by change order, the construction Contract Sum is the
base bid amount of $5,368.25 (including sales tax). The construction Contract Sum shall
include all items and services necessary for the proper execution and completion of the work.
The City hereby promises and agrees with the Contractor to employ, and does employ the
Contractor to provide the materials and to do and cause to be done the work described in the
Construction Contract Documents and to complete and finish the same according to the plans
and specifications and the terms and conditions herein contained; and hereby contracts to pay
for the same at the time and in the manner and upon the conditions provided for in this
Contract.
5. The Contractor agrees to comply with all state and federal laws relating to the employment of
labor and wage rates to be paid. The Contractor agrees to furnish insurance of the types and
the amounts set forth in the Construction Contract Documents.
6. The Contractor agrees to repair and replace all property of the City and all property of others
damaged by himself, his employees, and sub-contractors.
7. The Contractor for himself and for his heirs, executors, administrators, successors, and
assigns, does hereby agree to the full performance of all the covenants herein upon the part of
the Contractor.
8. It is further provided that no liability shall attach to the City of Port Orchard by reason of
entering into this Construction Contract, except as expressly provided herein.
City of Port Orchard and Viking Fence Company
Public Works Project No. PW2017-029
Small Works Contract No. COSO-17 Rev 6/24/16
Page 2 of 17
IN WITNESS WHEREOF, the parties hereto have caused this contract to be duly
executed on the date first written above.
CITY OF PORT ORCHARD CONTRACTOR
Robert Putannsuu, Mayor
Bv;TJ o &-T>c
Is: >7-
ATTEST/AUTHENTICATE:
Bram [C, City Clerk
APPROVED AS TO FORM:
SJjaron Cates
City Attorney
♦<>¥>%
I i SEAL ) I
CV/y of Port Orchard and Viking Fence Company
Public Works Project No. PW20I7-029
Small Works Contract No. C050-17 Rev 6/24/16
Page 3 of 17
CERTIFICATE AS TO CORPORATE PRINCIPAL
Ima, U s gJo &q^Vv|
Signer)) ceiWy that I am the /W
Title) of the coiporation named as the Contractor in the Agreement attached hereto; that
__________, (Contract Signer) who signed said Agreement on behalf
s then .Ap/K-UiW 'TT-efrAR V-e.r~ (Corporate Title) of said
corporation; that said Agreement was duly signed for and in behalf of said corporation by
authority of its governing body, and is within the scope of its corporate powers.
I.__ (Corporate Officer (Not Contract
^ I ht°a £(\ HSJr (Corporate
Wf the Contractor, wa
Corporate Se;
C
Corn, officer signature (not contract signer)
12*0 %€_1
nwjjj _____ '
1 pgi
Title
State of \X/A~)
County of IA'Kaj'J )
r\t>VAc
my sworn, deposes and sa^
__________, (corporate officer (not contract signer)) being
that he/she is c5e.C\-t\AMd
(Name of Corporation)
<!(Corporate
Title) of V/iV^y^
Subscribed and sworn to before me this day of
20 n
.diiMWIlUtif.
Sit-4
,*r. /tf ^qIARP ‘^hiotSt'/Public^Sfehature
\ \ puB^G .-•>/$ 1 ■ 15L.(ta^\ Q.U
PubUc (^) , / , „
'''7^ op commission expires £ / {*\
:
City of Port Orchard and Viking Fence Company
Public Works Project No. PW2017-029
Small Works Contract No. C050-17 Rev 6/24/16
Page 4 of 17
CITY OF PORT ORCHARD
PUBLIC WORK PROJECT TERMS AND CONDITIONS
The following terms and conditions shall be used in conjunction with the Standard Specifications
for Road, Bridge and Municipal Construction, 2016 edition, together with the APWA
Supplement (Section 1-99), as issued by the Washington State Department of Transportation and
American Public Works Association, Washington State Chapter, hereinafter referred to as the
"standard specifications". The standard specifications, except as they may be modified or
superseded by these provisions, shall govern all phases of work under this contract, and they are
by reference made an integral part of these specifications and contract as if herein fully set forth.
When the provisions of the standard specification conflict with the terms and conditions as
contained herein, the terms and conditions shall prevail.
1. BID PRICE: The bid price(s) shall include all necessary permits, and fees and items of labor,
material, equipment, tools, overhead and compensation, supplies, taxes, utilities and other
incidentals necessary to complete the work in a fully functional and operational state. All prices
including bid prices are in US funds.
2. DEFINITIONS: The term “City” means Port Orchard, Washington, “successful bidder” means
the apparent lowest and best responsible bidder to whom an award is made, and “Contractor”
means the successful bidder who has satisfied the requirements for the award and who receives a
contract executed by the City. “Bidder” means the person, firm or corporation that has made an
offer in response to the invitation to bid. “Work” means the construction and services required by
the Contract Documents, whether completed or partially completed, and includes all other labor,
materials, equipment and services provided or to be provided by the Contractor to fulfill the
Contractor’s obligations.
3. LICENSING AND REGISTRATION: The Contractor must have a Washington State
certificate of registration per chapter 18.27 RCW; a current state unified business identifier
number; and if applicable, industrial insurance coverage for the bidder's employees working in
Washington, an Employment Security Department number, and a state excise tax registration
number. In addition, the bidder must not be disqualified from bidding on any public works
contracts under RCW 39.06.010 or 39.12.065(3).
4. PUBLIC WORK REQUIREMENTS: This project constitutes a public work under state law.
Bidders are warned to take into consideration statutory legal requirements, particularly, the
payment of prevailing wages and fringe benefits, payment and performance bonds and sales tax
implications in making their bids. It is the sole responsibility of the bidder to insure that the
appropriate labor classification(s) are identified and that the applicable wage and benefit rates are
taken into consideration when preparing their bid according to these specifications. The
Contractor shall complete and file State of Washington, Department of Labor & Industries,
Statement of Intent to Pay Prevailing Wages and Affidavit of Wages Paid forms and shall
familiarize itself with their requirements. The Contractor shall also be responsible for and pay all
costs pertaining to the processing of these forms.
5. INSURANCE REQUIREMENT: The successful bidder will furnish insurance as stipulated in
the Attachment entitled “Insurance Requirements.”
6. RECEIPT OF ADDENDA: All official clarifications or interpretations of the bid documents
will be by written addenda only.
City of Port Orchard and Viking Fence Company
Public Works Project No. PW2017-029
Small Works Contract No. C050-17 Rev 6/24/16
Page 5 of 17
7. PROJECT COMPLIANCE: In compliance with the request for quotation, Bidder hereby
proposes to perform all work for this project in strict accordance with the Contract Documents, at
the Contract Sum, and within the time set forth herein with the understanding that time is of the
essence in the performance of this contract.
8. TAXES: Proposals shall include all applicable taxes except sales tax which is a separate bid
item. It shall be the Bidder's responsibility to furnish Federal Excise Tax Exemption Certificate,
when applicable.
9. ERROR IN EXTENSION: Unit price, when used, shall govern in case of extension error.
10. PERMITS AND FEES: The Contractor shall furnish all permits, inspection fees, and fees
required in the performance of this contract, including those charged under RCW 39.12.070 by
the Department of Labor and Industries works for the approval of statements of intent to pay
prevailing wages and the certification of affidavits of wages paid, etc. The Department may also
charge fees to persons or organizations requesting the arbitration of disputes under RCW
39.12.060. The Contractor is responsible for all fees resulting from these statutes.
11. CONTRACT: The Contract, when properly signed, will be the only form which will be
recognized by the City as an award. The executed Contract supersedes all previous
communications and negotiations, except as referenced herein, and constitutes the entire
agreement between the City and Contractor (parties), except as provided herein. The Contractor
shall not make any changes, alterations, or variations in the terms of the contract without the
written consent of the City. No terms stated by the Bidder in its proposal shall be binding on the
City unless accepted in writing by the City. The successful bidder may not assign the Contract
resulting from this invitation to bid without the City’s prior written consent. No waiver by the
City of a breach of any provision of the terms and conditions outlined in the invitation to bid
shall constitute a waiver of any other breach of such provision or of any other provisions.
12. CHANGE ORDERS: If the City or the Contractor requests a change in the Work, or either
party believes that a change is necessary, then the parties shall comply with the following
procedure to document and reflect a change in the Work: (a) The party requesting the change
shall write a description of the change and give the description to the other party (the “Change
Notice”); (b) Before proceeding with the change in Work, unless otherwise excused by
emergency, the Contractor shall provide the City with a fixed-price written estimate of the cost
and time impact of the change in Work; and (c) The City and the Contractor shall execute a
Change Order confirming their agreement as to the change in Work, the fixed-price cost, and the
extension of the Substantial Completion Date, if any. If the change in Work cannot be
performed on a fixed-price basis, the Change Order shall identify the agreed method of
compensation.
13. CHANGE DIRECTIVES: A “Change Directive” is a written order signed by the City,
directing a change in the Work prior to agreement on adjustment, if any, in the Contract Sum or
Substantial Completion Date, or both. The City may by Change Directive, without invalidating
the Contract, order changes in the Work within the general scope of the Contract consisting of
additions, deletions or other revisions, the Contract Sum and Substantial Completion Date being
adjusted accordingly. A Change Directive shall only be used in the absence of total agreement on
the terms of a Change Order. Upon receipt of a Change Directive, the Contractor shall promptly
proceed with the change in the Work and advise the City of its agreement or disagreement with
the proposed method for determining the proposed adjustment in the Contract Sum and/or
Substantial Completion Date, if any, provided in the Change Directive. A Change Directive
signed by the Contractor indicates agreement with all terms set forth in the Change Directive.
City of Port Orchard and Viking Fence Company
Public Works Project No. PW2017-029
Small Works Contract No. C050-17 Rev 6/24/16
Page 6 of 17
Such agreement shall be effective immediately and shall be recorded as soon as practical with a
Change Order. If the parties are unable to agree on an adjustment to the Contract Sum and/or
Substantial Completion Date, if any, then either party may submit the matter for determination in
accordance with Section 21.
14. MINOR CHANGES IN THE WORK: The City shall have the authority to order minor
changes in the Work not involving adjustment in the Contract Sum or extension of the
Substantial Completion Date and not inconsistent with the Contract documents. The Contractor
shall promptly carry out such written orders for minor changes in the Work.
15. COMPLIANCE WITH LAWS AND REGULATIONS: The Contractor warrants full
compliance with all applicable local, state or federal laws and regulations and agrees to
indemnify and defend the City against any loss, cost, liability or damage, including reasonable
attorney’s fees, by reason of successful bidder's violation of this paragraph.
16. INDEMNIFICATION: All services to be rendered or performed under contract will be
rendered or performed entirely at the Contractor’s own risk. The Contractor shall defend,
indemnify and hold the City, its officers, officials, employees and volunteers harmless from any
and all claims, injuries, damages, losses or suits including attorney fees, arising out of or in
connection with the performance of this Agreement, except for injuries and damages caused by
the sole negligence of the City. Should a court of competent jurisdiction determine that this
Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of
bodily injury to persons or damages to property caused by or resulting from the concurrent
negligence of the Contractor and the City, its officers, officials, employees and volunteers, the
Contractor’s liability hereunder shall be only to the extent of the Contractor’s negligence. It is
further specifically and expressly understood that the indemnification provided herein constitutes
the Contractor’s waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the
purposes of this indemnification. This waiver has been mutually negotiated by the parties. The
provisions of this section shall survive the expiration or termination of this Agreement.
17. TERMINATION: This Contract may be terminated in whole or in part, without penalty,
under the following conditions: 1) by mutual written agreement; 2) by the City for breach by the
Contractor of any of the obligations or requirements set forth in the contract documents which
would, at the option of the City, require the Contractor to assume liability for any and all
damages, including the excess of re-procuring similar products or services; 3) for convenience of
the City; or 4) by the City for non-appropriation of funds.
18. TERMINATION BY THE CITY WITHOUT CAUSE: Notwithstanding any other provisions
contained herein, the City, without cause, may terminate the contract between the parties by
providing notice to the Contractor. Upon termination under this section: 1) All remaining
obligations of the parties are discharged, but any right based upon breach or performance
occurring prior to termination survives; 2) If the reasonable costs of performance incurred by the
Contractor prior to termination exceed the amount paid by the City to the Contractor on the
Contract Sum, the City shall reimburse the Contractor in the amount of such excess; 3) If the
amount paid by the City to the Contractor on the Contract Sum exceeds the reasonable costs of
performance incurred by the Contractor prior to termination, the Contractor shall reimburse the
City in the amount of such excess; 4) Any funds obtained or retained by the Contractor as
provided in subsections 2) or 3), above, shall constitute full payment and consideration for the
services performed by the Contractor prior to termination.
City of Port Orchard and Viking Fence Company
Public Works Project No. PW2017-029
Small Works Contract No. C050-17 Rev 6/24/16
Page 7 of 17
19. COMPLIANCE WITH TERMS: The City may at any time insist upon strict compliance with
these terms and conditions, not withstanding any previous custom, practice, or course of dealing
to the contrary.
20. PAYMENT: Contractor shall maintain time and expense records and provide them to the
City along with monthly invoices in a format acceptable to the City for work performed to the
date of the invoice. All invoices shall be paid by the City within 45 days of receipt of a proper
invoice. If the services rendered to not meet the requirements of the Contract, Contractor will
correct or modify the work to comply with the contract. City may withhold payment for such
work until work meets the requirements of the Contract.
21. DISPUTE RESOLUTION: In the event there is a dispute between the parties, the parties
agree to resolve that dispute in the following manner: (a) The parties shall attempt in good faith
to resolve any dispute promptly through negotiation. Either party may give the other party
written notice that a dispute exists (a “Notice of Dispute”). The Notice of Dispute shall include a
statement of such party’s position. Within ten (10) days of the delivery of the Notice of Dispute,
the parties shall meet at a mutually acceptable time and place and attempt to resolve the dispute;
(b) If the parties are unable to resolve the dispute, they may elect to submit the dispute to
mediation. The cost of the mediation shall be borne equally by each party. The mediator shall be
selected by the mutual agreement of the parties; (c) If the mediation does not result in a
settlement of the dispute, the dispute shall be settled by binding arbitration by the Judicial and
Arbitration Mediations Service (“JAMS”) in accordance with the then operative construction
rules of JAMS. The parties may select an arbitrator by mutual agreement, or if unable to agree,
the arbitrator will be selected pursuant to the rules of JAMS. The parties shall be bound by the
decision of such arbitrator. The arbitration shall be conducted in Kitsap County, Washington;
provided, if JAMS is unable to conduct the arbitration in Kitsap County, then the arbitration shall
be held in such location as the parties may agree after consulting with JAMS.
22. WARRANTY: Contractor shall provide a one (1) year warranty for the work and
improvements installed by Contractor pursuant to the Contract, subject to the following terms
and conditions: Contractor agrees that the work and improvements installed pursuant to the
Contract shall remain free from defects in material, workmanship and installation (or, in the case
of landscaping, shall survive,) for a period of twelve (12) months after written and final
acceptance of the same and approval by the City. Maintenance is defined as acts carried out to
prevent a decline, lapse or cessation of the state of the project or improvements as accepted by
the City during the twelve (12) month period after final and written acceptance, and includes, but
is not limited to, repair or replacement of defective workmanship, materials or installations.
Contractor shall, at its sole cost and expense, carefully replace and/or repair any damage or
defects in workmanship, materials or installation to the City-owned real property on which
improvements have been installed, and leave the same in as good condition as it was before
commencement of the work. City and Contractor agree that in the event any of the
improvements or restoration work installed or completed by Contractor pursuant to the Contract
fail to remain free from defects in materials, workmanship or installation (or in the case of
landscaping, fail to survive), for a period of twelve (12) months from the date of
approval/acceptance of the work by the City, Contractor shall repair and/replace the same within
ten (10) days of demand by the City, and if Contractor should fail to do so, then Contractor shall:
City of Port Orchard and Viking Fence Company
Public Works Project No. PW2017-029
Small Works Contract No. C050-17 Rev 6/24/16
Page 8 of 17
Verification of Coverage. The Contractor shall furnish the City with original certificates and a
copy of the amendatory endorsements, including but not necessarily limited to the additional
insured endorsement, evidencing the Automobile Liability and Commercial General Liability
insurance of the Contractor before commencement of the work. Before any exposure to loss may
occur, the Contractor shall file with the City a copy of the Builders Risk insurance policy that
includes all applicable conditions, exclusions, definitions, terms and endorsements related to this
project.
Subcontractors. The Contractor shall have sole responsibility for determining the insurance
coverage and limits required, if any, to be obtained by subcontractors, which determination shall
be made in accordance with reasonable and prudent business practices.
Notice of Cancellation. The Contractor shall provide the City and all Additional Insureds for this
work with written notice of any policy cancellation, within two business days of their receipt of
such notice.
Failure to Maintain Insurance. The insurance required by this Section will not be canceled,
materially changed or altered without forty-five (45) days prior written notice submitted to the
City. Failure on the part of the Contractor to maintain insurance as required shall constitute a
material breach of contract, upon which the City may, after giving five business days’ notice to
the Contractor to correct the breach, immediately terminate the contract, or, at its discretion,
procure or renew such insurance and pay any and all premiums in connection therewith, with any
sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset
against funds due the Contractor from the City.
City of Port Orchard and Viking Fence Company
Public Works Project No. PW2017-029
Small Works Contract No. C050-17 Rev 6/24/16
Page 12 of 17
CITY OF PORT ORCHARD
DECLARATION OF OPTION FOR PERFORMANCE
BOND OR ADDITIONAL RETAINAGE
\\(CONTRACTS UNDER $35.000 ONLY)
Note: This form niust be submitted at the time the Contractor executes the Contract. The
Contractor shall designate the option desired by checking the appropriate space.
The Contractor elects to:
(1) Furnish a performance bond in the amount of the total contract sum.
An executed performance bond on the required form is included with the executed
contract documents.
(2) Have the City retain, in lieu of the performance and payment bonds,
fifty percent (50%) of the total contract amount for a period of thirty days after
date of final acceptance, or until receipt of all necessary releases from the
department of revenue and the department of labor and industries and settlement
of any liens filed under chapter 60.28 RCW, whichever is later. RCW 39.08.010.
In choosing option 2, the Contractor agrees that if the Contractor, its heirs, executors,
administrators, successors, or assigns, shall in all things stand to and abide by, and well and truly
keep and perform the covenants, conditions and agreements in the Contract, and shall faithfully
perform all the provisions of such contract and shall also well and truly perform and fulfill all the
undertakings, covenants, terms, conditions and agreements of any and all duly authorized
modifications of the Contract that may hereafter be made, at the time and in the manner therein
specified, and shall pay all laborers, mechanics, subcontractors, and materialmen, and all persons
who shall supply such person or persons, or subcontractors, with provisions and supplies for the
carrying on of such work, on his or her part, and shall defend, indemnify, and save harmless the
City of Port Orchard, Washington, its officers and agents from any claim for such payment, then
the funds retained in lieu of a performance bond shall be released at the time provided in said
option 2; otherwise, the funds shall be retained until the Contractor fulfills the said obligations.
£
ConVactor Signature, Date
Bona No.
City of Port Orchard and Viking Fence Company
Public Works Project No. PW2017-029
Small Works Contract No. C050-17 Rev 6/24/16
Page 13 of 17