Loading...
008-19 - Neptune Marine, LLC - Supplement / Change Order 2Authorization for Change Order No. 2 Date: Mav 30. 2019 Rockwell Pocket Park Project: improvements Contract / Job # C008-19 Contractor: Neptune Marine LLC ------------ 1004 Commercial Ave. 250 Anacortes, WA 98221 THIS CHANGE ORDER AUTHORIZES THE ADDITIONAL WORK: THE INSTALLATION OF EXTRUDED CURB IN LIEU OF CONCRETE TRAFFIC CURB. I have reviewed the Change Order information above and certify that to the best of my knowledge descriptions and costs are true and accurate. 177 Contractor Approval Signature Publ C ity Engineer T MARK R. DORSEY P.E. Printed Name & Title Printed Name Change Orders that do not exceed 10%, with a maximum of $50,000, of either legally authorized budget limit or contract Approved-, amount established by City Council can be approved by the Public Mayor Works Director, Change Orders that do not exceed 10%, with a maximum of Attest $100,000, of either legally authorized budget limit or contract amount established by City Council are to be approved by the City Clerk Mayor. Change Orders over $100,000 or exceed a total of 10% require Council Action. Council Approval Date WENGINEERINGWARKS - LANDSCAPEIPARKSIPOB VVTF Park Expansion & Rockwell Park\Rockwell Park\Admin\Final Design & Construction Phase\RP - CACMIChange OrderslCO- 021Neptune Change Order #2 - RP.docx Page 1 CONTRACT CHANGE ORDER (CCO) NO. 2 Project Name: Rockwell Pocket Park Improvement Project Date: 05/30/2019 To: Neptune Marine LLC 1004 Commercial Ave. 250 Anacortes, WA 98221 Attention: Travis Crabb Ordered by Engineer under terms of Section 1-04.4 of the Standard Specifications X Change proposed by Contractor JUSTIFICATION The contractor proposed the change to install extruded curb in lieu of the designed concrete traffic curb as a cost savings and the ease of construction. DESCRIPTION CIF WORK The replacement of proposed concrete traffic curb with extruded curb, MEASUREMENT AND PAYMENT The proposed change reduces the unit price of the concrete traffic curb (line item 26) to $17.00 per linear foot from $37.50 per linear foot and increases the bid quantity to 213 linear feet from 135 linear feet. TIME No additional days are associated with this change order, ORIGINAL CURRENT EST. NET CHANGE TOTAL CHANGE ORDERS, EST. CONTRACT AFTER CONTRACT CONTRACT THIS CHANGE ORDER_ INCLUDING THIS ONE THIS CHANGE ORDER $412.848.67 $424w228.27-$1,571,24 $9,808.36 $422 657.04 DAYS 120 DAYS: 0 DAYS: 0 DAYS: 120 All work, materials and measurements to be in accordance with the provisions of the original contract and/or the standard specifications and special provisions for the type of construction involved. The payments and/or additional time specified and agreed to in this order include every claim by the Contractor for any extra payment or extension of time with respect to the work described herein, including delays to the overall project. Change Order#2 1 of 2 Attachment: Neptune Proposal Change Order #2 2of2 Ian Smith From: Travis Crabb <Travis@neptunemarine.biz> Sent: Thursday, May 2, 2019 7:SS AM To: Ian Smith; Mark Dorsey Cc: Levi Nicholl Subject: Rockwell Extruded Curb HI Ian, If we want to use extruded Curb at Rockwell, Neptune/Curbmaster can provide curb for 17.00 a LF Thanks, Travis Crabb