005-02 - City of Bremerton - Supplement / Change Order Addendum 1ADDENDUM NO. 1 TO
INTERLOCAL AGREEMENT
For
Cooperative Water System Development
In the
Port Orchard 580 Zone / Bremerton 580 Zone
This Addendum No. 1 amends the Interlocal Agreement (the "Agreement") entered into
between the City of Bremerton, a municipal corporation, hereinafter referred to as "Bremerton,"
and the City of Port Orchard, hereinafter referred to as "Port Orchard" executed on December
26, 2001, and
WHEREAS, the parties mutually desire to modify the responsibilities of each party with
respect to the agreed upon provision of water; NOW THEREFORE
All provisions in the Agreement shall remain in full force and effect except as expressly
modified by this document.
For valuable consideration and by mutual consent of the parties, the modifications to the
Agreement are as follows:
I.
1. Amend Section 4. entitled "Water Supply" as follows:
Delete the section titled "4200 Feigley Property" in its entirety and replace it with the
following;
Bremerton West 580 Zone Supply
Port Orchard agrees to supply water for domestic use and fireflow to the Bremerton West
580 pressure zone via its 16 inch water main in Old Clifton Road, until such time as a
separate Bremerton storage reservoir is constructed and operational. Fireflow
rates/volumes and service pressures supplied by Port Orchard will be a minimum of
1,700 gpm for three hours at a minimum gradient of 540 feet at the connection.
Bremerton agrees to supply water to Port Orchard, via its connection to the 16 inch Port
Orchard watermain in Clifton Road (Old Clifton Road connection), to replenish the water
supplied by Port Orchard to the Bremerton West 580 pressure zone. The water supplied
by Bremerton to Port Orchard will be delivered at a minimum -hydraulic gradient of 580.
The volume of water supplied by Port Orchard to the Bremerton West 580 pressure zone
shall be replenished by Bremerton on a continuous basis, or as otherwise agreed to.
Distribution piping, as required by the City of Bremerton, will be extended by others
from Port Orchard's water main in Old Clifton Road. Connection locations and details
require approval from the City of Port Orchard. Master meters will be installed at the
point of connection. Domestic meters will be installed and maintained by the City of
Bremerton, or as otherwise agreed to, and be billed directly to the customer.
Addendum No. 1 to Interlocal Agreement 1 June 18, 2004
2. Transmission Main:
Delete all references in the agreement to the City of Bremerton "12-inch transmission
main" and replace them with "16-inch transmission main".
3. Plan for Cooperative water System Development
Amend the section entitled "Monitoring of Supplied Water" on page 8 of 11 as follows:
Delete "4200 Feigley meter — For this connection Port Orchard is the supplying utility
and Bremerton is the receiving utility." and replace it with the following:
"West 580 Zone supply Meters - For these connections Port Orchard is the supplying
utility and Bremerton is the receiving utility."
The parties whose names appear represent that they are authorized to enter into a contract
amendment that is binding on the parties of this contract.
IN WITNESS WHEREOF, the parties have executed this Addendum 1. to the Agreement on the
day fully executed below.
CITY OF PORT ORCHARD
By
Its; o
DATE:
APPROVED AS TO FORM:
ATTEST:
CITY OF BREMERTON
By Car, Bozeman
Its Mavor
DATE:
APPROVED AS TO FORM:
Roger A. Lubovich
Bremerton City Attorney
Addendum No. 1 to Interlocal Agreement 2 June 18, 2004