Loading...
10 Example SFR Permit Fees 2024CITY OF PORT ORCHARD Permit Center Located at 720 Prospect Street Mailing Address 216 Prospect Street, Port Orchard, WA 98366 Phone: (36o) 874-5533 • permitcenter@portorchardwa.gov Single Family Residential Building Permit Fee Estimate April 10, 2024 Subject to Change without Notice The following is intended to provide builders with an estimate of the total cost to build a single- family home in the City of Port Orchard. The estimate assumes a 2-story 2,000 square foot house with an attached 400 square foot garage on a lot measuring 50 feet in width. The exact fees will vary depending on the house size, location within the city, lot characteristics, and number of fixtures. Please contact the Permit Center to get an estimate for your specific project. Building Permit Fee, Residential........................................................................................$3,043.00 Plan Review Fee, Residential...............................................................................................$1,977.95 PlumbingBase Fee.......................................................................................................................$23.50 PlumbingFixture Fee...................................................................................................................$93.00 MechanicalBase Fee....................................................................................................................$23.50 Mechanical Fixture Fee............................................................................................................ $119.80 TechnologyFee........................................................................................................................... $10.00 StateSurcharge................................................................................................................................. $6.50 ParkImpact Fee........................................................................................................................$6,251.61 TrafficImpact Fee...................................................................................................................$6,003.30 SchoolImpact Fee...................................................................................................................$1,370.83 Water Connection Fee (includes meter and inspection).........................................$13,890.111 Sewer Connection Fee (1 ERU)........................................................................................$14,839.89' Total Estimated Cost..................................................................................$47,652.992 1 Estimate based on Port Orchard Utilities. Some areas of the city are served by West Sound Utility District or Bremerton Utilities. If on other service provider, please call for rates: • West Sound Utility District: (360) 876-2545 City of Bremerton Public Works and Utilities: (360) 473-5278 2 The assumptions used in the calculations above may be found on page 2, along with additional fees to consider that may apply to your project. Page 1 of 2 CITY OF PORT ORCHARD -.. 216 Prospect Street Port Orchard WA 98366 " A PERMIT FEE ESTIMATE (360) 874-5533 �gd .II""I_c I"�_. Example for a Single Family Residence permticenter@portorchardwa.gov April 10, 2024 - SUBJECT TO CHANGE WITHOUT NOTICE VALUATION DETAILS Type Sq. ft. Valuation New residential floor 1000.00 $165,670.00 space, main (first) floor New residential floor 1000.00 $165,670.00 space, second floor New garage (attached 400.00 $25,676.00 or detached) Total Estimated Valuation: $357,016.00 ESTIMATED BUILDING PERMIT FEES Building Permit Fee, Residential $3,043.00 Plan Review, Residential $1,977.95 Plumbing Base Fee $23.50 Plumbing Fixture Fee $93.00 Mechanical Base Fee $23.50 Mechanical Fixture Fee $119.80 Technology fee surcharge $10.00 State Surcharge $6.50 Total Estimated Fees: $5.297.25 Additional Considerations: Electrical permit Port Orchard does not issue electrical permits. For application and fee information, fees. contact State Labor and Industries. Fixture fees. This example includes mechanical and plumbing fixtures frequently found in a home of this size: clothes washer, cook stove, fans, fireplace, gas furnace, gas pipe system, gas water heater, AC, clothes washer, dishwasher, hose bibs, tub/showers, and toilets. Impact Fees. Any impact fees due on the project must be paid prior to issuing the building permit, unless deferred. A separate application and fee for a deferral is required. • School: $1,370.83 • Park: $6,251.61 • Traffic: $6,003.30 Utility Connection Water Connection Fees (3/4" meter) - $13,890.11 fees. Breakdown of charges: Example only. Capital facilities fee - $13,325.69 1/4" meter - $175.68 Inspection fee - $111.37 If a front footage fee is required, it is calculated at $111.37 per frontage lin. ft. Sewer Connection Fee (1 ERU) -- $14,839.89 Breakdown of charges: $4,370.76 - Waste Water Treatment Facility (WWFC) fee $10,357.76 — General Facility Charge (GFC) fee $111.37 — inspection fee If a front footage fee is required, it is calculated at $111.37 per frontage lin. ft. Concurrency fees. If there is not already a Capacity Reservation Certificate for the parcel, a concurrency application will be required. The fee total for is $460.00. Fire Sprinklers. If a fire sprinkler system is required, the permit and fees are under a separate application. Other fees. Other permit processes and fees may be required. See the Community Development and Public Works Fee Schedules on the Permit Center page of the City's website. Page 2 of 2